Section III: Operation
3.0.OPE.SL-214
CHANGING HOOK HEIGHT: 36” TO 54” JIB HEIGHT ADJUSTMENT PROCEDURE
(cont’d)
STEP 4.
CONTINUE TO TILT TELESCOPIC ARM REARWARD UNTIL THE DUMP CYLINDERS ARE FULLY EXTENDED.
REPLACE LOCK PIN AND SECURE WITH HITCH PIN.
WARNING:
DO NOT REMOVE LOCK PIN ON THE ADJUSTABLE JIB WHILE JIB IS IN THE 36” HOOK POSITION AND
THE TELESCOPIC ARM IS TILTED REARWARD (AS SHOWN). POSSIBLE PROPERTY DAMAGE AND/OR
PERSONAL INJURY MAY RESULT.
3-5
Содержание SL-214
Страница 1: ...Hooked on Quality PA R T S A N D O P E R AT I O N M A N U A L HOIST SERIAL NUMBER MODEL SL 214...
Страница 2: ......
Страница 30: ...This Page Intentionally Left Blank...
Страница 40: ...This Page Intentionally Left Blank...
Страница 46: ...This Page Intentionally Left Blank...
Страница 51: ...Section II Installation Accessories 2 8 INS ACC LEDLB 2 39...
Страница 52: ...This Page Intentionally Left Blank...
Страница 56: ...This Page Intentionally Left Blank...
Страница 64: ...This Page Intentionally Left Blank...
Страница 68: ...Section IV Maintenance 4 0 MAI SL 214 LUBRICATION DIAGRAM LEGEND GW Grease Weekly GM Grease Monthly 4 2...
Страница 78: ...This Page Intentionally Left Blank...
Страница 90: ...This Page Intentionally Left Blank...
Страница 105: ......
Страница 106: ...1800 NE BROADWAY AVENUE DES MOINES IA 50313 TOLL FREE 888 767 8000...