![Swann Cleaning Module-II Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/swann/cleaning-module-ii/cleaning-module-ii_operators-manual_1411477009.webp)
Cleaning Module-II
Installation
A-96.250.599 / 020620
9
2.3. Electrical Connection
Depending on the instrument, the electrical connection is made in
one of the following ways:
AMI Codes-II, AMI Codes-II TC, AMI Codes-II CC, AMI Phos
-
phate-II, AMI Phosphate HL: Proceed according to section
Connection via peristaltic pump of the analyzer, p. 9
AMI SAC254: Proceed according to section
Direct connection to the AMI transmitter, p. 11
Connection via
peristaltic
pump of the
analyzer
With this type of connection, the peristaltic pump of the Cleaning
Module-II is connected to the peristaltic pump of the analyzer.
WARNING
Electrical shock hazard!
Disconnect the AMI analyzer from the mains before connecting
the signal cable.
Proceed as follows:
1
Switch off the analyzer according to chapter 6 «Stop of Opera
-
tion for Maintenance» in the corresponding manual.
2
Open the peristaltic pump of the analyzer:
–
Release and remove the occlusion frames.
–
Unscrew the 4 screws and remove the cover.
–
Disconnect the motor connector [A].
A
Motor connector
A