
10
A-96.250.599 / 020620
Cleaning Module-II
Installation
3
Feed the signal cable coming from the Cleaning Module-II
through a cable gland of the peristaltic pump housing.
4
Connect the wires according to the connecting diagram below.
5
Reconnect the motor connector [A] and screw the cover onto
the peristaltic pump housing. Install and close the occlusion
frames.
6
Switch on the analyzer.
Connection
diagram
CLEANING
MODULE II
18
15
16
17
18
14
11
12
13
1
2
33
34
35
36
BLACK
BLACK
AMI Transmitter
WHITE
WHITE
GREEN
GREEN
BROWN
PROCESSOR
BROWN
15
16
17
PERICLIP
PE
L/(+)
AC/DC
N/(-)
AC/DC
OPTION
- AMI Codes-II
- AMI Codes-II TC
- AMI Codes-II CC
- AMI Phosphate-II
- AMI Phosphate HL
J0
J2
5
6
LEVEL