
Cleaning Module-II
Installation
A-96.250.599 / 020620
11
Direct
connection to
the AMI
transmitter
With this type of connection, the peristaltic pump of the Cleaning
Module-II is connected directly to the AMI transmitter and the pho
-
tometer is connected to the peristaltic pump of the Cleaning Mod
-
ule-II.
WARNING
Electrical shock hazard!
Disconnect the AMI analyzer from the mains before connecting
the signal cable.
To connect the Cleaning Module-II to the AMI SAC254 proceed as
follows:
1
Switch off the analyzer according to chapter 6 «Stop of Opera
-
tion for Maintenance» in the corresponding manual.
2
Open the housing of the AMI transmitter. Disconnect the pho
-
tometer from the AMI transmitter and pull out the cable from the
cable gland.
3
Feed the signal cable coming from the Cleaning Module-II into
the housing of the AMI transmitter. Connect the wires according
to the connecting diagram below.
4
Close the housing of the AMI transmitter.
5
Open the peristaltic pump of the Cleaning Module-II:
–
Release and remove the occlusion frames.
–
Unscrew the 4 screws and remove the cover.
–
Disconnect the motor connector [A].
A
Motor connector
A