
33 of 34
Indesit
Company
Service Manual UK
English
M. Motor
1.
Slacken the belt as in (E) 1 to 8.
2.
Lift the motor clear from the base moulding.
3.
Replace in reverse order first positioning the belt over the jockey wheel.
It will be necessary to use the motor special tool as a lever on the motor casing (as illustrated) to
enable it to be rotated under tension to line up the holes in rear moulding with the fixing holes on
the motor casing.
Refit the 3 hex head screws.
N.
Drum Assembly
1.
Remove the top cover as in (A).
2.
Remove the side panels as in (B).
3.
Remove the console as in (C).
4.
Slacken the belt as in (E) 1 to 8.
5.
Remove the rear bearing as in (J).
6.
Remove the front panel as in (F) leaving the air duct attached to the front panel if required.
7.
The drum can now be removed from the rear panel.
8.
Replace in reverse order.
NOTE: When reassembling, a new drive pin must be fitted.
O. Rear Seal
1.
Remove the drum as in (N).
2.
Remove the rear seal and clean any remnants of the seal and adhesive from the inner face of rear
panel.
IMPORTANT NOTE
The correct size Drum Rear Seal must be always be fitted to the Dryer.
Refer to the parts system for correct part number.
Rotate motor with the motor special
tool using downward pressure to
tension the belt and line up motor
fixings in rear moulding
Note:
It is recommended the motor
If Pipe Grips or a similar tool is used,
ensure the pliers do not cause damage
to the motor windings.
Special Tool is used to fit the motor/belt.