CHASSIS 5-17
• Install the piston/cup set.
• When installing the brake light switch, align the projection on
the switch with the hole in the master cylinder.
• When remounting the master cylinder on the handlebars,
align the master cylinder holder’s mating surface with the
punched mark
A
on the handlebars, and then tighten the
upper clamp bolt first.
'
Master cylinder bolt: 10 N·m (1.0 kgf-m)
• Install the brake hose union as shown and tighten the union
bolt to the specified torque.
'
Brake union bolt: 23 N·m (2.3 kgf-m)
• Fill the master cylinder with brake fluid and bleed air.
(
#
2-14)
Boot
Spring
Primary cup
Piston
Secondary cup
Snap ring
Master cylinder
Upper
clamp
bolt
Handlebar
Clearance
Punch mark
20˚
20˚
20˚
Содержание RV125
Страница 1: ...9 9 5 0 0 3 1 2 3 3 0 1 E...
Страница 34: ...PERIODIC MAINTENANCE 2 21...
Страница 56: ...3 20 ENGINE CRANKSHAFT Remove the crankshaft with the special tool 09920 13120 Crankcase separator...
Страница 174: ...6 6 ELECTRICAL SYSTEM CHARGING SYSTEM Generator Regulator rectifier SCR IG switch Battery Load SCR SCR SCR SCR Fuse IC...
Страница 191: ...ELECTRICAL SYSTEM 6 23 SPEEDOMETER Disassemble the speedometer as follows...
Страница 241: ...8 10 RV125K4 K5 04 05 MODELS REAR FENDER INSTALLATION 6 5 N m 0 65 kgf m...
Страница 250: ...Prepared by 2nd Ed January 2006 1st Ed January 2003 Part No 99500 31233 01E Printed in Japan 256...
Страница 251: ...Printed in Japan K3 K4 K5 K6...