5-8 CHASSIS
SPEEDOMETER GEARBOX
• Apply SUZUKI SUPER GREASE to the speedometer gear-
box.
!
!
!
!
99000-25010: SUZUKI SUPER GREASE “A”
• Align the lugs
1
on the speedometer gearbox with the
recesses
2
on the front wheel.
FRONT WHEEL
• Make sure that the stopper
3
on the front fork and the speed-
ometer gearbox protrusion
4
are installed as shown.
"
• Tighten the front axle to the specified torque.
• Tighten the front axle pinch bolt
5
to the specified torque.
#
#
#
#
09900-18710: Hexagon socket (12 mm)
$
Front axle: 65 N·m (6.5 kgf-m)
Front axle pinch bolt: 23 N·m (2.3 kgf-m)
NOTE:
* Before tightening the front axle pinch bolt
5
, move the front
fork up and down four or five times.
* After remounting the front wheel, pump the brake lever a few
times to check for proper brake operation.
When installing the front wheel, position the brake
disc between the brake pads. Be careful not to dam-
age the brake pads.
Содержание RV125
Страница 1: ...9 9 5 0 0 3 1 2 3 3 0 1 E...
Страница 34: ...PERIODIC MAINTENANCE 2 21...
Страница 56: ...3 20 ENGINE CRANKSHAFT Remove the crankshaft with the special tool 09920 13120 Crankcase separator...
Страница 174: ...6 6 ELECTRICAL SYSTEM CHARGING SYSTEM Generator Regulator rectifier SCR IG switch Battery Load SCR SCR SCR SCR Fuse IC...
Страница 191: ...ELECTRICAL SYSTEM 6 23 SPEEDOMETER Disassemble the speedometer as follows...
Страница 241: ...8 10 RV125K4 K5 04 05 MODELS REAR FENDER INSTALLATION 6 5 N m 0 65 kgf m...
Страница 250: ...Prepared by 2nd Ed January 2006 1st Ed January 2003 Part No 99500 31233 01E Printed in Japan 256...
Страница 251: ...Printed in Japan K3 K4 K5 K6...