
ENGINE MECHANICAL (K9K ENGINE) 6A2-17
EGR Valve and Intake Pipe Removal and
Installation
Removal
1) Disconnect negative (–) cable at battery.
2) Disconnect EGR valve connector (1) and boost pressure
sensor connector (2).
3) Disconnect hose (3) from oil vapor recirculation valve (4),
and then remove oil vapor recirculation valve.
4) Remove EGR valve (1) with gasket using special tool.
Special tool
(A): 09916-48130
5) Remove intake pipe No.1 (1) and No.2 (2).
6) Disconnect hoses (2) from EGR cooler water pipe (1), and
then remove EGR cooler water pipe.
1
3
2
4
1
(A)
1
2
2
1