1A-73 Engine General Information and Diagnosis:
2
5) If OK, then check the continuity between each terminal
and ground.
Special tool
(A): 09900–25008 (Multi-circuit tester set)
Injector continuity
∞
Ω
(Infinity)
Are the resistance and continuity OK?
Go to Step 2.
Replace the injector
with a new one. Refer to
“Throttle Body
Disassembly and
Assembly in Section 1D
(Page 1D-14)”.
3
1) Turn the ignition switch ON.
2) Measure the injector voltage between the Y/R wire and
ground.
NOTE
Injector voltage can be detected only for 3
seconds after ignition switch is turned ON.
Special tool
(A): 09900–25008 (Multi-circuit tester set)
Tester knob indication
Voltage (
)
Injector voltage
Battery voltage
((+) terminal: Y/R – (–) terminal: Ground)
Is the voltage OK?
• Gr/W wire open or
shorted to ground, or
poor “42” connection
(#1 cylinder).
• Gr/B wire open or
shorted to ground, or
poor “51” connection
(#2 cylinder).
• If wire and
connection are OK,
intermittent trouble or
faulty ECM.
• Recheck each
terminal and wire
harness for open
circuit and poor
connection.
• Replace the ECM
with a known good
one, and inspect it
again. Refer to “ECM
Removal and
Installation in Section
1C (Page 1C-1)”.
Open circuit in the Y/R
wire.
Step
Action
Yes
No
(A)
I940H1110063-02
(A)
I940H1110064-01
Содержание Intruder VZ1500
Страница 2: ......
Страница 4: ......
Страница 14: ...00 9 Precautions ...
Страница 62: ...0C 12 Service Data ...
Страница 190: ...1D 1 Engine Mechanical Engine Engine Mechanical Schematic and Routing Diagram ...
Страница 484: ...4C 10 Rear Brakes ...
Страница 521: ...Clutch 5C 16 09920 53740 09930 40113 Clutch sleeve hub holder Rotor holder Page 5C 7 Page 5C 9 Page 5C 14 Page 5C 14 ...
Страница 522: ...5C 17 Clutch ...
Страница 536: ...6B 11 Steering Handlebar ...
Страница 580: ...Prepared by September 2008 Part No 99500 39370 03E Printed in U S A 580 ...