GSX-R750K2 (’02-MODEL) 11-13
THROTTLE BODY REMOVAL
• Lift and support the fuel tank with its prop stay.
• Disconnect the IAT sensor coupler
1
and PAIR hose
2
.
• Disconnect the IAP sensor coupler
3
and vacuum hose
4
.
• Disconnect the crankcase breather hose
5
.
• Loosen the throttle body clamp screws.
• Remove the air cleaner box mounting bolt.
• Remove the air cleaner box.
Содержание GSX-R750
Страница 1: ...GSX R750 SUZUKI MOTOR CORPORATION PRINTED IN JAPAN FEBRUARY 2000 99500 37112 03E...
Страница 46: ...PERIODIC MAINTENANCE 2 29...
Страница 97: ...ENGINE 3 49 Driveshaft Countershaft TRANSMISSION PARTS LOCATION...
Страница 172: ...FISYSTEMANDINTAKEAIRSYSTEM 4 25 FI SYSTEM WIRING DIAGRAM...
Страница 249: ...5 20 COOLINGANDLUBRICATIONSYSTEM ENGINE LUBRICATION SYSTEM MAIN GALLERY To sub gallery...
Страница 250: ...COOLINGANDLUBRICATIONSYSTEM 5 21...
Страница 391: ...8 18 SERVICING INFORMATION FUEL TANK DRAIN HOSE ROUTING Face the clamp to downside Fuel tank drain hose...
Страница 495: ...Prepared by 3rd Ed August 2002 1st Ed February 2000 Part No 99500 37112 03E Printed in Japan 488...