ENGINE 3-17
3
2
35F
1
3
2
35F
1
1
2
3
1413
2
3
1413
CAMSHAFTS
• Remove the valve timing inspection cap
1
.
• Turn the crankshaft to bring the line
A
on the starter clutch to
the index mark
B
of the valve timing inspection hole and also
to bring the cams to the position as shown.
• Remove the cam chain tension adjuster cap bolt
1
.
NOTE:
The spring
3
and ball
4
are in the cam chain tension adjuster.
• Remove the oil hose union bolt
2
and oil hose.
• Remove the cam chain guide
2
.
• Remove the intake camshaft journal holder
3
.
• Remove the exhaust camshaft journal holder
4
.
#
Be sure to loosen the camshaft journal holder bolts
evenly by shifting the wrench diagonally.
Содержание GSX-R750
Страница 1: ...GSX R750 SUZUKI MOTOR CORPORATION PRINTED IN JAPAN FEBRUARY 2000 99500 37112 03E...
Страница 46: ...PERIODIC MAINTENANCE 2 29...
Страница 97: ...ENGINE 3 49 Driveshaft Countershaft TRANSMISSION PARTS LOCATION...
Страница 172: ...FISYSTEMANDINTAKEAIRSYSTEM 4 25 FI SYSTEM WIRING DIAGRAM...
Страница 249: ...5 20 COOLINGANDLUBRICATIONSYSTEM ENGINE LUBRICATION SYSTEM MAIN GALLERY To sub gallery...
Страница 250: ...COOLINGANDLUBRICATIONSYSTEM 5 21...
Страница 391: ...8 18 SERVICING INFORMATION FUEL TANK DRAIN HOSE ROUTING Face the clamp to downside Fuel tank drain hose...
Страница 495: ...Prepared by 3rd Ed August 2002 1st Ed February 2000 Part No 99500 37112 03E Printed in Japan 488...