7-42 ELECTRICAL SYSTEM
RECHARGING OPERATION
• Using the multi circuit tester, check the battery voltage. If the
voltage reading is less than the 12.0V (DC), recharge the bat-
tery with a battery charger.
* When recharging the battery, remove the battery from
the motorcycle.
* Do not remove the caps on the battery top while re-
charging.
Recharging time: 5A for one hour or 1.2A for 5 to 10 hours
Be careful not to permit the charging current to exceed
5A at any time.
• After recharging, wait for more than 30 minutes and check the
battery voltage with a multi circuit tester.
• If the battery voltage is less than the 12.5V, recharge the bat-
tery again.
• If battery voltage is still less than 12.5V, after recharging, re-
place the battery with a new one.
• When the motorcycle is not used for a long period, check the
battery every 1 month to prevent the battery discharge.
Содержание GSX-R750
Страница 1: ...GSX R750 SUZUKI MOTOR CORPORATION PRINTED IN JAPAN FEBRUARY 2000 99500 37112 03E...
Страница 46: ...PERIODIC MAINTENANCE 2 29...
Страница 97: ...ENGINE 3 49 Driveshaft Countershaft TRANSMISSION PARTS LOCATION...
Страница 172: ...FISYSTEMANDINTAKEAIRSYSTEM 4 25 FI SYSTEM WIRING DIAGRAM...
Страница 249: ...5 20 COOLINGANDLUBRICATIONSYSTEM ENGINE LUBRICATION SYSTEM MAIN GALLERY To sub gallery...
Страница 250: ...COOLINGANDLUBRICATIONSYSTEM 5 21...
Страница 391: ...8 18 SERVICING INFORMATION FUEL TANK DRAIN HOSE ROUTING Face the clamp to downside Fuel tank drain hose...
Страница 495: ...Prepared by 3rd Ed August 2002 1st Ed February 2000 Part No 99500 37112 03E Printed in Japan 488...