Form ASIPC6-Propeller Electrical Leads Shorting
Reissued: 2
Revision: 1
Date: July 2020
Page 1 of 1
MAINTENANCE PROGRAM
PILATUS PORTER PC6
Ref. EMM PT6A-27 Chapter 72-00-00
PILATUS PC6 – PROPELLER ELECTRICAL LEADS SHORTING
Aircraft
Registration
:
…………….
Job Number
:
…………….
Aircraft S/N
:
…………….
NO.
DESCRIPTION
TASK NO.
MECH.
ENG.
RII
1.
If signs of arcing between de-icer leads and the propeller spinner,
bulkhead or hub assembly have been found, check propeller de-icing
system (Ref. Aircraft Maintenance Manual) and rectify.
N/A
2.
Inspect engine:
(a) Remove and inspect RGB chip detector, oil strainer, and main oil
filter (Ref.72-10-00, 79-20-02). If metallic debris is found, refer to
FAULT ISOLATION.
72-10-00,
79-20-02
N/A
(b) Turn the propeller by hand and listen for unusual noises coming
from the reduction gearbox or PT bearings (Ref. Para. A.(4)). For
unusual noises, slow propeller acceleration on start or abrupt
deceleration on shutdown, send power section to an approved
overhaul facility for Light Overhaul. Indicate propeller electrical
leads short and any discrepancy noted. Otherwise, run engine at
80% TO power for ten minutes.
N/A
(c) Remove and inspect RGB chip detector, oil strainer, and main oil
filter (Ref. 72-10-00, 79-20-02). If no metallic debris is found, return
engine to service and check RGB chip detector daily for one week
(25 hours minimum).
72-10-00,
79-20-02
N/A
(d) Inspect main oil filter after one week (25 hours minimum, 65 hours
maximum) (Ref. 79-20-02). If no metallic debris is found, return to
standard inspection intervals.
79-20-02
N/A
MAINTENANCE RELEASE
I hereby certify that aircraft parts and component mentioned above has been inspected and maintained in
accordance with the Maintenance Program and meets requirements of applicable Civil Aviation Safety
Regulations that is determined to be in an airworthy condition.
Name
: .......................................
Signature
: .......................................
Authorization Card’s No.
: .......................................
Date
: .......................................
Содержание PILATUS PORTER PC6
Страница 2: ...MAINTENANCE PROGRAM PILATUS PC 6 DOCUMENT NUMBER SAP 27 REISSUE 2 REVISION 1 JULY 2020...
Страница 3: ......
Страница 4: ......
Страница 97: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 7 of 26...
Страница 98: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 8 of 26...
Страница 99: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 9 of 26...
Страница 100: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 10 of 26...
Страница 101: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 11 of 26...
Страница 102: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 12 of 26...
Страница 103: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 13 of 26...
Страница 104: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 14 of 26...
Страница 105: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 15 of 26...
Страница 106: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 16 of 26...
Страница 107: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 17 of 26...
Страница 108: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 18 of 26...
Страница 109: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 19 of 26...
Страница 110: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 20 of 26...
Страница 111: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 21 of 26...
Страница 112: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 22 of 26...
Страница 113: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 23 of 26...
Страница 122: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 6 of 25...
Страница 123: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 7 of 25...
Страница 124: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 8 of 25...
Страница 125: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 9 of 25...
Страница 126: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 10 of 25...
Страница 127: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 11 of 25...
Страница 128: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 12 of 25...
Страница 129: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 13 of 25...
Страница 130: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 14 of 25...
Страница 131: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 15 of 25...
Страница 132: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 16 of 25...
Страница 133: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 17 of 25...
Страница 134: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 18 of 25...
Страница 135: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 19 of 25...
Страница 136: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 20 of 25...
Страница 137: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 21 of 25...
Страница 138: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 22 of 25...
Страница 144: ...Form ASI PC6 Propeller Installation Reissued 2 Revision 1 Date July 2020 Page 3 of 7...
Страница 145: ...Form ASI PC6 Propeller Installation Reissued 2 Revision 1 Date July 2020 Page 4 of 7...
Страница 151: ...Form ASI PC6 Propeller Removal Reissued 2 Revision 0 Date October 2019 Page 3 of 7...
Страница 152: ...Form ASI PC6 Propeller Removal Reissued 2 Revision 0 Date October 2019 Page 4 of 7...
Страница 178: ...Form ASI PC6 Alignment Symmetry Inspection Reissued 2 Revision 1 Date July 2020 Page 4 of 4 Table 2...
Страница 216: ...Form No ASI MD 65 Revision 3 July 2020 Page 5 of 7 Figure 201 Identification and Location of Fuel Manifold Adapters...
Страница 218: ...Form No ASI MD 65 Revision 3 July 2020 Page 7 of 7 Figure 203 Fuel Manifold Installation Clearance Checks...
Страница 231: ...Form No ASI MD 71 Revision 3 July 2020 Page 2 of 4 FIGURE 1...
Страница 232: ...Form No ASI MD 71 Revision 3 July 2020 Page 3 of 4 FIGURE 2...
Страница 233: ...Form No ASI MD 71 Revision 3 July 2020 Page 4 of 4 FIGURE 3...
Страница 244: ...Form No ASI MD 90 Revision 3 July 2020 Page 4 of 8...
Страница 246: ...Form No ASI MD 90 Revision 3 July 2020 Page 6 of 8...