MAINTENANCE PROGRAM
PILATUS PORTER PC6
CHAPTER 2
MAINTENANACE PROGRAM
DOCUMENT NO.:
SAP 27
Reissued: 2
Revision: 1
Date: July 2020
Page: 2 - 1
The Pilatus Porter PC-6 Maintenance Program contains instructions for continued
airworthiness. It’s designed to satisfy safety requirements, to avoid deterioration and optimize
aircraft availability with the reasonable cost in labor, material and facilities.
2.1. SCHEDULE MAINTENANCE
The Scheduled inspection program includes all of the inspections for the Model Pilatus
Porter PC-6 airplanes is recommended by manufacture. A Scheduled maintenance
inspection program schedule applicable for airplane Susi Air must be selected as early
as possible. The inspections are done at subsequent intervals that are related to hours,
calendar months, years, or in accordance with (IAW) the manufacturer's instructions.
A calendar month starts on the first day of the month. You must complete the
inspections on or before the last day of the month for their related calendar month
interval.
2.2. UNSCHEDULED MAINTENANCE
Unscheduled maintenance checks are necessary if unusual incidents occur. These
checks must be done before the next flight following the incident. Depending on the
severity of an incident, it may be advisable to remove the wings, horizontal stabilizer,
elevator, rudder and landing gear to allow a more comprehensive inspection to be
done. If necessary, contact Pilatus Aircraft Limited for further advice.
These checks must be done after the following incidents occur:
2.2.1 High G-loads
These checks must be done when high g-loads that are more than the design
limits occur during flight. If loose or cracked paint is found during this check, it
can indicate that the structure of the aircraft is damaged.
2.2.2 Hard or Overweight Landing
If loose or cracked paint is found during this check, it can indicate that the
structure of the aircraft is damaged.
a.
Hard Landing
Hard landing is when the aircraft lands with a
high sink rate or high sideslip,
or both.
b.
Overweight Landing
This is when the aircraft lands at a weight which is more than the maximum
approved.
Содержание PILATUS PORTER PC6
Страница 2: ...MAINTENANCE PROGRAM PILATUS PC 6 DOCUMENT NUMBER SAP 27 REISSUE 2 REVISION 1 JULY 2020...
Страница 3: ......
Страница 4: ......
Страница 97: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 7 of 26...
Страница 98: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 8 of 26...
Страница 99: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 9 of 26...
Страница 100: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 10 of 26...
Страница 101: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 11 of 26...
Страница 102: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 12 of 26...
Страница 103: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 13 of 26...
Страница 104: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 14 of 26...
Страница 105: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 15 of 26...
Страница 106: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 16 of 26...
Страница 107: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 17 of 26...
Страница 108: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 18 of 26...
Страница 109: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 19 of 26...
Страница 110: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 20 of 26...
Страница 111: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 21 of 26...
Страница 112: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 22 of 26...
Страница 113: ...Form ASI PC6 Engine Installation Reissued 2 Revision 1 Date July 2020 Page 23 of 26...
Страница 122: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 6 of 25...
Страница 123: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 7 of 25...
Страница 124: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 8 of 25...
Страница 125: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 9 of 25...
Страница 126: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 10 of 25...
Страница 127: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 11 of 25...
Страница 128: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 12 of 25...
Страница 129: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 13 of 25...
Страница 130: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 14 of 25...
Страница 131: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 15 of 25...
Страница 132: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 16 of 25...
Страница 133: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 17 of 25...
Страница 134: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 18 of 25...
Страница 135: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 19 of 25...
Страница 136: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 20 of 25...
Страница 137: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 21 of 25...
Страница 138: ...Form ASI PC6 Engine Removal Reissued 2 Revision 1 Date July 2020 Page 22 of 25...
Страница 144: ...Form ASI PC6 Propeller Installation Reissued 2 Revision 1 Date July 2020 Page 3 of 7...
Страница 145: ...Form ASI PC6 Propeller Installation Reissued 2 Revision 1 Date July 2020 Page 4 of 7...
Страница 151: ...Form ASI PC6 Propeller Removal Reissued 2 Revision 0 Date October 2019 Page 3 of 7...
Страница 152: ...Form ASI PC6 Propeller Removal Reissued 2 Revision 0 Date October 2019 Page 4 of 7...
Страница 178: ...Form ASI PC6 Alignment Symmetry Inspection Reissued 2 Revision 1 Date July 2020 Page 4 of 4 Table 2...
Страница 216: ...Form No ASI MD 65 Revision 3 July 2020 Page 5 of 7 Figure 201 Identification and Location of Fuel Manifold Adapters...
Страница 218: ...Form No ASI MD 65 Revision 3 July 2020 Page 7 of 7 Figure 203 Fuel Manifold Installation Clearance Checks...
Страница 231: ...Form No ASI MD 71 Revision 3 July 2020 Page 2 of 4 FIGURE 1...
Страница 232: ...Form No ASI MD 71 Revision 3 July 2020 Page 3 of 4 FIGURE 2...
Страница 233: ...Form No ASI MD 71 Revision 3 July 2020 Page 4 of 4 FIGURE 3...
Страница 244: ...Form No ASI MD 90 Revision 3 July 2020 Page 4 of 8...
Страница 246: ...Form No ASI MD 90 Revision 3 July 2020 Page 6 of 8...