- 6 -
1.1 Open the packaging of machine
1.1.1
W
ARNING
> The machine must be placed in the direction of the package logo, can not be inverted.
> Put the machine on a flat, stable surface.
1.1.2
P
ROCEDURE
OPEN THE PACKAGE IN THE FOLLOWING STEPS
:
:
#1 Need at least two people to put the machine on the ground
;
#2 Cut off four packing straps on the box
;
#3 Remove the box
;
#4 Check the supplied accessories (toolbox, water pipe, etc.)
;
#5 Remove the plastic protective material from the machine
;
#6 Take away the 4 fixing rail which is used during transportation
;
#7Need at least two people to lift the fixing rail and place it on the workbench;
At least two people lift the machine carriage and place it on the workbench
At least two people lift the machine carriage and place it on the workbench
At least two people lift the machine carriage and place it on the workbench
At least two people lift the machine carriage and place it on the workbench
;
#8 Take down the screw which is fixed the carriage
;
#9 keep the package,recommend to disassemble it and lay flat.
Take down the screw which is fixing the carriage