- 14 -
1.6 START THE EDGER
1.6.1
P
ROCEDURE
Start the machine according to the following procedure:
The adjustment of the amount of the water outlet in the processing room is as showed in the below
picture.
0
:
turn off
1
:
turn on
#1 Check if the machine switch is off: The ON / OFF switch is in the OFF
position and the main power plug is disconnected.
#2 Install the collet and collet seat onto the spindle.
#3 Plug in and open the switch (ON / OFF switch).
#4 simulate to start the machine, adjust the flow adjustment screw
located on the left side of the machine, adjust the water flow of the
nozzle and the amount of water spray in the grinding room.
#5 Get 1 to 2 tasks to check if the machine is working properly.
adjustment
of
the
amount of
the
back
water for
PC
Adjustment
of
the
amount of
the
front
water
for
wheel
Adjustment of
the amount
of the water
for
the
transparent
board to block
the water.
Switch
position
of
the
machine