9
/
40
Super Snow
3.Preparation before condenser and evaporator installation
5.Adjust the bolts suitable length(L=top thickness(E) - box
inside cover thickness(E’)), means L=E-E’
■
L
:
Bolts length
■
E
:
Top thickness
■
E
':
Box inside cover thickness
Bolts preparation
1
、
Bolts
2
、
Silicon sealing
3
、
Box external vertical wall
4
、
PU foaming
5
、
Box internal vertical wall
6
、
Evaporator vertical panel
7
、
Gaskets
8
、
M12 bolts
Bolts assemble
1.Put silicone inside the bolts
2.Put the bolts into the drilling hole
3.Gently press the silicone seal with a wooden hammer
Содержание KX-350K
Страница 1: ...1 40 Super Snow Installation Manual KX 350K...
Страница 10: ...10 40 Super Snow 3 Preparation before condenser and evaporator installation Condenser installation drawing 350K...
Страница 39: ...39 40 Super Snow 13 Installation overview a Unit b Pipes and harness c Controller d Compressor a c b d...