31
/
40
Super Snow
10.Install cab control and connect electrical
Driver cab: Preparation
RECOMMENDATIONS
■
Before drilling the floor, check the location of fuel
tank, harness and/or tubes
.
1.Drill a hole in the cab floor (behind driver or
passenger seat – depends on battery location).
RECOMMENDATIONS
■
Protect the hole (ex: armored hose) to avoid harness
& hoses damage.
2.Run the cab command and ignition cable to the
dashboard.
Содержание KX-350K
Страница 1: ...1 40 Super Snow Installation Manual KX 350K...
Страница 10: ...10 40 Super Snow 3 Preparation before condenser and evaporator installation Condenser installation drawing 350K...
Страница 39: ...39 40 Super Snow 13 Installation overview a Unit b Pipes and harness c Controller d Compressor a c b d...