14
/
40
Super Snow
4.Hoses and clamp installation
Hoses: Stocking
Recommendations
■ For a good functioning of refrigeration circuit,
refrigeration hoses must be clean and dry.
■ Hoses must be stocked in a dry area, with less
variation in temperature as possible and sheltered from
moisture.
■ The two ends MUST ABSOLUTELY been
blocked with tight caps to avoid any internal damages or
condensation until their connection into the circuit.
□
To fit hoses and electrical harnesses, use as much as
possible RSGU clamps.
□
To protect hoses and electrical harnesses, use adequate
rubber funnels to avoid cutting with metallic corners.
Содержание KX-350K
Страница 1: ...1 40 Super Snow Installation Manual KX 350K...
Страница 10: ...10 40 Super Snow 3 Preparation before condenser and evaporator installation Condenser installation drawing 350K...
Страница 39: ...39 40 Super Snow 13 Installation overview a Unit b Pipes and harness c Controller d Compressor a c b d...