SC847BE1C/2C Chassis Manual
viii
Permanent and Optional Standoffs ................................................................. 4-8
4-6
Expansion Card Setup .................................................................................. 4-10
Installing Expansion Cards ........................................................................... 4-10
4-7
Removing and Installing the Backplanes .......................................................4-11
4-8
Air Shroud Modiication and Installation
....................................................... 4-15
Air Shroud Installation ................................................................................... 4-15
4-9
System Fans ................................................................................................. 4-18
4-10 Power Supply ............................................................................................... 4-20
Chapter 5 Rack Installation
5-1 Overview ......................................................................................................... 5-1
5-2
Unpacking the System .................................................................................... 5-1
5-3
Preparing for Setup ......................................................................................... 5-1
Choosing a Setup Location ............................................................................. 5-1
5-4
Warnings and Precautions .............................................................................. 5-2
Rack Precautions ............................................................................................ 5-2
General Server Precautions ............................................................................ 5-2
Rack Mounting Considerations ....................................................................... 5-3
Ambient Operating Temperature ................................................................ 5-3
Reduced Airlow
......................................................................................... 5-3
Mechanical Loading ................................................................................... 5-3
Circuit Overloading ..................................................................................... 5-3
Reliable Ground ......................................................................................... 5-3
5-5
Rack Mounting Instructions ............................................................................. 5-4
Identifying the Sections of the Rack Rails ...................................................... 5-4
Locking Tabs ................................................................................................... 5-5
Releasing the Inner Rail ................................................................................. 5-5
Installing The Inner Rails on the Chassis ....................................................... 5-6
Installing the Outer Rails on the Rack ............................................................ 5-7
Standard Chassis Installation ......................................................................... 5-8
Optional Quick Installation Method ................................................................. 5-9
Appendix A SC847BE1C/2C Cables and Hardware
Appendix B SC847BE1C/2C Power Supply Speciications
Appendix C BPN-SAS3-846EL Front Backplane Speciications
Appendix D BPN-SAS3-826EL Backplane Speciications
Appendix E Front and Rear Backplane Cascading
Содержание SC847BE1C series
Страница 12: ...SC847BE1C 2C Chassis Manual 1 4 Notes...
Страница 57: ...4 19 Chapter 4 Chassis Setup and Maintenance Figure 4 22 Placing the System Fan...
Страница 60: ...SC847BE1C 2C Chassis Manual 4 22 Notes...
Страница 70: ...SC847BE1C 2C Chassis Manual 5 10 Notes...
Страница 76: ...SC847BE1C 2C Chassis Manual B 2 Notes...
Страница 102: ...D 8 SC847BE1C 2C Chassis Manual Notes...
Страница 112: ...D 18 SC847BE1C 2C Chassis Manual Notes...