
6-3
Chapter 6: Rack Installation
Reduced Air
fl
ow
Equipment should be mounted into a rack so that the amount of airfl ow required
for safe operation is not compromised.
Mechanical Loading
Equipment should be mounted into a rack so that a hazardous condition does not
arise due to uneven mechanical loading.
Circuit Overloading
Consideration should be given to the connection of the equipment to the power
supply circuitry and the effect that any possible overloading of circuits might have
on overcurrent protection and power supply wiring. Appropriate consideration of
equipment nameplate ratings should be used when addressing this concern.
Reliable Ground
A reliable ground must be maintained at all times. To ensure this, the rack itself
should be grounded. Particular attention should be given to power supply connec-
tions other than the direct connections to the branch circuit (i.e. the use of power
strips, etc.).
Содержание SC512F Series
Страница 4: ...SC512 Chassis Manual iv Notes ...
Страница 6: ...SC512 Chassis Manual vi Notes ...
Страница 10: ...SC512 Chassis Manual x Notes ...
Страница 14: ...SC512F Chassis Manual 1 4 Notes ...
Страница 24: ...Chassis Manual 4 4 Notes ...
Страница 40: ...Chassis Manual 5 16 Notes ...
Страница 47: ...6 7 Chapter 6 Rack Installation 2 3 Figure 6 4 Installing the Outer Rails to the Server Rack 3 ...
Страница 51: ...1 Appendicies Appendicies Appendix A Compatible Cables Appendix B SC512F Power Supply Specifications ...
Страница 52: ...Appendicies 2 Notes ...
Страница 56: ...Chassis Manual A 4 Notes ...
Страница 58: ...Chassis Manual B 2 Notes ...