6-1
Chapter 6: Rack Installation
Chapter 6
Rack Installation
6-1 Overview
This chapter provides a quick setup checklist to install the chassis into a rack.
6-2 Unpacking the System
You should inspect the box the chassis was shipped in and note if it was damaged
in any way. If the chassis itself shows damage you should file a damage claim with
the carrier who delivered it.
Decide on a suitable location for the rack unit that will hold your chassis. It should
be situated in a clean, dust-free area that is well ventilated. Avoid areas where
heat, electrical noise and electromagnetic fields are generated. You will also need
it placed near a grounded power outlet. Be sure to read the Rack and Server Pre-
cautions in the next section.
6-3 Preparing for Setup
The box your chassis was shipped in should include two sets of rail assemblies,
two rail mounting brackets and the mounting screws you will need to install the
system into the rack. Please read this section in its entirety before you begin the
installation procedure outlined in the sections that follow.
Choosing a Setup Location
Leave enough clearance in front of the rack to enable you to open the front
•
door completely (~25 inches).
Leave approximately 30 inches of clearance in the back of the rack to allow for
•
sufficient airflow and ease in servicing.
This product is for installation only in a Restricted Access Location (dedicated
•
equipment rooms, service closets and the like).
Содержание SC512-260B
Страница 8: ...SC512 Chassis Manual viii Notes ...
Страница 26: ...SC512 Chassis Manual 3 10 Notes ...
Страница 30: ...SC512 Chassis Manual 4 4 Notes ...
Страница 48: ...SC512 Chassis Manual 5 18 Notes ...
Страница 69: ...B 3 Appendix B SC512F Power Supply Specifications Notes ...