2-1
Chapter 2: System Safety
Chapter 2
System Safety
2-1 Overview
This chapter provides a quick setup checklist to get your chassis up and running.
Following the steps in the order provided should enable you to have your chassis
setup and operational within a minimal amount of time. This quick set up assumes
that you are an experienced technician, familiar with common concepts and ter-
minology.
2-2 Warnings and Precautions
You should inspect the box the chassis was shipped in and note if it was damaged
in any way. If the chassis itself shows damage, file a damage claim with carrier
who delivered your system.
Decide on a suitable location for the rack unit that will hold the chassis. It should be
situated in a clean, dust-free area that is well ventilated. Avoid areas where heat,
electrical noise and electromagnetic fields are generated.
You will also need it placed near at least one grounded power outlet. When con-
figured, the SC213 chassis includes a power supply which requires a grounded
outlet.
2-3 Preparing for Setup
The SC213 chassis includes a set of rail assemblies, including mounting brackets
and mounting screws you will need to install the systems into a rack. Please read
this manual in its entirety before beginning the rack installation procedure.
Содержание SC213A-R720LPB
Страница 8: ...SC213 Chassis Manual viii Notes...
Страница 12: ...SC213 Chassis Manual 1 4 Notes...
Страница 52: ...SC213 Chassis Manual 5 10 Notes...
Страница 56: ...SC213 Chassis Manual A 4 Notes...
Страница 58: ...SC213 Chassis Manual B 2 Notes...
Страница 69: ...C 11 Appendix C SAS 213A Backplane Specifications Notes...