3-5
Chapter 3: Setup and Installation
NOTE:
These handles are optional and need only be installed when mounting the system
into a short rack. When mounting into a deep rack, they are unnecessary and regular screws
should be used instead of thumbscrews.
Be aware that these handles are not to be used for lifting the system, they are only to
be used to slide the system within the rack.
6. With one person on either side (see the descriptive label on the side of the
enclosure), lift the enclosure and slide it into the installed rails.
WARNING:
Be sure that the enclosure is empty of all blades, power supplies, switches and
management modules
BEFORE
lifting. These should be installed
AFTER
the enclosure is
mounted in the rack. Injury and damage may occur if components are not removed from the
rack prior to installation.
7. After pushing the enclosure all the way into the rack, use two roundhead screws on
each side of the server to lock it into place.
Figure 3-3. Attaching the Optional Handles
8. The enclosure is now securely installed in the rack (see
Содержание 8U SuperBlade
Страница 1: ...8U SuperBlade User s Manual Revision 1 0 5 MP and 10 DP Blade System 20 DP Blade System...
Страница 4: ...8U SuperBlade User s Manual ii Notes...
Страница 8: ...8U SuperBlade User s Manual iv Notes...
Страница 10: ...8U SuperBlade User s Manual ii Notes...
Страница 12: ...8U SuperBlade User s Manual ii Notes...
Страница 42: ...8U SuperBlade User s Manual 2 18 Notes...
Страница 48: ...8U SuperBlade User s Manual 3 6 Figure 3 4 Enclosure Installed into Rack...
Страница 72: ...8U SuperBlade User s Manual A 4 Notes...
Страница 74: ...8U SuperBlade User s Manual...