Installation
900301-00 08/2018
Innovative Hearth Products
BRT40ST See-Through B-Vent Gas Fireplaces
The appliance is shipped with all gas controls
and components installed and pre-wired.
1.
Remove the shipping carton.
2.
Remove hood buy pulling away from unit
(see
Figure 7
).
3.
Remove front face assembly and barrier by
lifting approimately 1/2" and pulling away
from unit
(see
Figure 7
)
.
4.
Remove the modesty panel by pulling the
bottom right corner of the modesty panel
out slightly to disengage the snap-fit fea-
ture; lift the modesty panel by the tab on
the panel's right end, pull the right end of
the panel away from the cabinet and then
pull the panel diagonally out of the left side
cabinet panel slots. Remove the modesty
panel carefully, so that none of the wires
become loose or disconnected.
5.
Open the latch (located under the firebox
floor) securing the glass enclosure panel.
Remove the panel by tilting it outward at
the bottom and lifting it up. Set the door
aside protecting it from inadvertent damage.
See
Figure 24
on Page 21.
6.
Remove log set box from firebox. Next,
remove embers, vermiculite and volcanic
stone from control compartment. Handle
logs carefully to prevent breakage.
Control Compartment Access Panel
Figure 7 - Unit Parts Identification
Front face assembly
Barrier
Control Compartment (behind assembly)
Hood
Figure 8 - Nailing Flanges
TYPICAL INSTALLATION SEQUENCE
The typical sequence of installation is outlined
below. However, each installation is unique and
may result in variations to the steps described.
See the page numbers references in the follow-
ing steps for detailed procedures.
Step 1.
(
Page 11
)
Construct the appliance
framing. Position the appliance within the
framing and secure with nailing brackets and
floor anchor tabs.
Step 2.
(
Page 13
)
Route gas supply line to
appliance location.
Step 3.
(
Page 13
)
Install the vent system and
exterior termination.
Step 4.
(
Page 14
)
Field Wiring
a. Millivolt Appliances - The operating control
switch is factory installed.
Step 5.
(
Page 15
)
Make connection to gas
supply.
Turn tabs down and secure to the floor with
8d nails or other appropriate fasteners
on all sides of the unit which do not have
viewing glass panels.
EDVST SHOWN
(EDVPF - NO NAILING FLANGES
ON END WITH GLASS PANEL)
EDVCL SHOWN
(FOR EDVCR VIEW, INTERCHANGE SIDES)
Remove these two screws and
use them when installing
the nailing flanges.
Nailing Flanges
Note: The nailing flanges, combustible members and screw heads located in areas directly adjacent to the nailing
flanges, are EXEMPT from the 1/2” clearance to combustible requirements for the firebox outer wrapper.
Combustible framing may be in direct contact with the nailing flanges and may be located closer than 1/2” from
screw heads and the firebox wrapper in areas adjacent to the nailing flanges. Frame the opening to the exact
dimensions specified in the framing details of this manual.
Turn tabs down and secure to the floor with
8d nails or other appropriate fasteners on all sides
of the unit which do not have viewing glass panels.
Remove these two screws and
use them when installing
the nailing flanges.
Nailing
Flanges
PRE-INSTALLATION STEPS
Step 6.
(
Page 16
)
Install and verify outside
air kit operation.
Step 7.
(
Page 17
)
Checkout appliance opera-
tion.
Step 8.
(
Page 18
)
Install the log set, vermicu-
lite, volcanic stone and glowing embers.
Step 9.
(
Page 21
)
Removing and Installing
glass enclosure panels.
Step 10.
(
Page 21
)
Adjust burner primary air
shutter to achieve proper flame appearance.
Step 11.
(
Page 22
)
Install front face assembly
with barrier and hoods.
Step 12.
(
Page 23
)
Conduct limit switch
spillage test.
Step 13.
(
Page 24
)
Attach safety in operation
warnings.
NOTE: Front Face Assembly with
barrier installed must be rein-
stalled prior to operation.