4) I/O setting switch (SW3, SW4)

I/O setting is done for each 32 points with the I/O setting switch (SW3, SW4). Setting is read in 

only once when power is supplied to the computer or when the reset command is executed on 

the 

S-LINK V

 system side.

Changing the switch setting during operation is ineffective.

I/O setting switch

(Example)

In case of

Input: 0 to 127, 256 to 383
Output: 128 to 225, 384 to 511

No.

Address

ON

OFF

SW3

1

0  to  31

Input

Output

2

32 to 63

3

64 to 95

4

96 to 127

5

128 to 159

6

160 to 191

7

192 to 223

8

224 to 255

SW4

1

256 to 287

2

288 to 319

3

320 to 351

4

352 to 383

5

384 to 415

6

416 to 447

7

448 to 479

8

480 to 511

Note:  When setting I/O through a program, set all the switches to input (ON).

5) System set button (SW1)

The system set button (SW1) is pressed to read and memorize the connection condition of the 

S-LINK V

 units. Later, it is possible to check Error 3, Error 4 and Error 5 using the present condi-

tion as the basis.

Notes: 1)  If the system set button is pressed when Error 3 occurs, the error is canceled. However, if the 

cause of the error is not recti  ed, the error address is, from now on, missed out from the checked 
items. (The address is considered to be in unit unconnected condition.)

 

2)  If the system set button is pressed when Error 4 occurs, the error is canceled and the connection 

condition including the addresses where Error 4 has occurred is read again and stored.

6) Transmission indicator (Green)

It blinks when communicating (during signal transmission) with the 

S-LINK V

 I/O units. (Turns off 

during no transmission)
Blinking interval differs depending on the transmission speed. (A mode: Fast, C mode: Slow)

7) Busy indicator (Orange)

It lights up during the system setting or transmission process con  rmation.

It lights up when the power supply (+24V and computer side) is switched on till I/O refresh is 

started.
It lights up during the system setting (after pressing the system set button or executing system 

setting from the computer side), and turns OFF when the system setting is completed.

8) Error indicator (Red)

It lights up when an error occurs on the 

S-LINK V

 system main cable. In case the cause of the er-

ror is eliminated, it blinks, and if the error No. is cleared with software, or when the system setting 
is done, it turns off.

Notes: 1)  Error 0 to Error 6 cannot be distinguished with the error indicator. Check with a program on the 

computer by using “

5) HML0 + 48: Error No. / Error state

” in “

4. Assignment on computer

.”

 

2)  In order to change blinking condition to light turned OFF condition, carry out with “

Error No. clear 

request

” explained in “

6) HML0 + 49: Command execution request register

” in “

4. Assignment 

on computer

.”

9) Interruption setting (JP1)

It sets the resource generating the interruption.

Set by choosing one from IRQ 03, 04, 05, 07, 09 and “ineffective” with JP1.

Содержание SL-VISA

Страница 1: ...CMJE SLVISA No 0006 81V...

Страница 2: ...cable Take care that wrong wiring will damage the product Wiring This product has been developed produced for industrial use only In case noise generating equipment switching regulator inverter motor...

Страница 3: ...d Tightening torque of the terminal screws 0 5 to 0 6 N m Terminal block connector MSTB2 5 7 STF 5 08 with ange Made by Phoenix Contact 2 I O rst address setting switch SW5 SW6 I O rst address setting...

Страница 4: ...rol number is set with the I O control number setting switch SW2 5 to SW2 8 Setting is read in only once when power is supplied to the computer Changing the mode switch setting during operation is ine...

Страница 5: ...d and the connection condition including the addresses where Error 4 has occurred is read again and stored 6 Transmission indicator Green It blinks when communicating during signal transmission with t...

Страница 6: ...or No clear indication Default indication System set indication Interruption indication Busy indication On hold indication Under com mand execution indication Control board Computer R HML0 4B Bank cha...

Страница 7: ...2 HML0 19 207 206 205 204 203 202 201 200 HML0 1A 215 214 213 212 211 210 209 208 HML0 1B 223 222 221 220 219 218 217 216 HML0 1C 231 230 229 228 227 226 225 224 HML0 1D 239 238 237 236 235 234 233 23...

Страница 8: ...ffected S LINK V I O unit is indicated When each bit is 1 the S LINK V I O unit having the allocated address has a cable break or the I O unit is in abnormal condition In case Bank change over respons...

Страница 9: ...uit switches to the bank change over response register and then writes in the bank number User s computer It reads out bank number of the bank change over response register User s computer When the re...

Страница 10: ...When setting is done by a program I Os can be set in units of 16 In this case set all the I O set ting switches to input 0 ON If the change is done by software it is automatically changed within 1 to...

Страница 11: ...t be transmitted After the output data is written if 1 is written into HML0 49 bit 0 and the next output data is written in after con rming that HML0 4A bit 0 has turned to 1 then output data transmis...

Страница 12: ...nding to HML0 49 once and check that the bit corresponding to HML0 4A has turns to 0 prior to the execution 2 System set and Command cannot be executed during an interruption occurrence Only clear anc...

Страница 13: ...or 0 OFF ON when bit 1 is 1 bit 7 6 5 4 3 2 1 0 Assignment Input hold 1 Hold 0 Hold cancel Input change interruption 1 Effective 0 Ineffective Occurrence condition for input change interruption 1 ON O...

Страница 14: ...tsushita Electronic Compo nents Co Ltd 3 Use a local power supply at a cable distance of less than 10m from each I O device Conditions in use for CE conformity Note Do not connect a surge absorber bet...

Страница 15: ...and 1 s pulse width Common 1 000Vp 10ms cycle 1 s pulse width with noise simulator Voltage withstandability Note 5 1 000V AC for one min between external terminals and ground Insulation resistance Not...

Страница 16: ...the delivery of the product 3 Failure caused by a development which could not be foreseen based upon the technology in practice at the time of purchase or contract 4 Failure caused by use which deviat...

Отзывы: