22
INSTALLATION and OPERATION MANUAL
INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL
INSTALLATION and OPERATION MANUAL
4.2. Model РBM R -
with one coil
PBM R
300
PBM R
500
PBM R/H*
800
PBM R/H*
1000
Capacity
L
300
500
800
1000
Height without insulation / with insulation
H, Hi, mm
1410/1460
1700/1750
1838/1888
2039/2089
Minimal vertical clearance
mm
1430
1727
1877
2073
Diameter without insulation /with insulation
D, mm
Ø 550/750
Ø 650/850
Ø 790/990
Ø 790/990
Operating pressure/Max. buffer temperature
bar/
0
C
3/95
3/95
3/95
3/95
Operating pressure /Max. coil temperature
bar/
0
C
16/110
16/110
16/110
16/110
Recommended boiler size, connected to buffer tank
kW
6-10
10-17
15-27
18-33
Weight without insulation/with insulation
kg, kg i
75/85
106/118
144/161
164/182
Sleeve for Electric heating element
В, mm, Rp 1
1/2
”
860
997
1090
1260
Heat carrier
С1, mm, Rp1
1/2
”
240
239
290
290
Heat carrier
С2, mm, Rp1
1/2
”
240
239
290
290
Heat carrier
С3, mm, Rp1
1/2
”
550
643
710
775
Heat carrier
С4, mm, Rp1
1/2
”
550
643
710
775
Heat carrier
С5, mm, Rp1
1/2
”
860
997
1090
1260
Heat carrier
С6, mm, Rp1
1/2
”
860
997
1090
1260
Heat carrier
С7, mm, Rp1
1/2
”
1170
1451
1750
1750
Heat carrier
С8, mm, Rp1
1/2
”
1170
1451
1750
1750
Sensor sleeve
А1, mm, Rp1/2”
240
239
290
290
Sensor sleeve
А2, mm, Rp1/2”
550
643
710
775
Sensor sleeve
А3, mm, Rp1/2”
860
997
1090
1260
Sensor sleeve
А4, mm, Rp1/2”
1170
1451
1750
1750
Air vent sleeve
F, mm, Rp1
1/2
”
1410
1700
2039
2039
Coil capacity S1
S1 L
5.6
9.8
14
15.2
Heat exchange surface S1
S1 m
2
0.9
1.6
2.3
2.48
Inlet/Outlet Lower coil S1
S1i/S1o, mm, Rp1”
640/240
689/239
785/290
830/290
Содержание P 1500
Страница 2: ...2 INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL ...
Страница 8: ...8 INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL CONNECTIONS SCHEMES ...
Страница 9: ...9 INSTALLATION and OPERATION MANUAL INSTALLATION and OPERATION MANUAL ...
Страница 13: ...13 INSTALLATION and OPERATION MANUAL INSTALLATION and OPERATION MANUAL ...
Страница 36: ...36 INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL 8 SHEMES t 65 C ...
Страница 37: ...37 INSTALLATION and OPERATION MANUAL INSTALLATION and OPERATION MANUAL ...
Страница 38: ...38 INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL ...
Страница 43: ...INSTALLATION and OPERATION MANUAL INSTALLATION and OPERATION MANUAL ...
Страница 44: ...ISO 9001 BUREAU VERITAS Certification tel 359 700 17 343 www burnit bg ...