Содержание Hybrid Inverter with a Generator

Страница 1: ...ybrid Inverter with a Generator Global Tech China Ltd 3 Floor Wai Yip Industrial Building 171 Wai Yip Street Kwun Tong Kowloon Hong Kong Tel 852 2884 4318 Fax 8522884 4816 www sunsynk com sales global...

Страница 2: ...M DIAGRAM 9 3 6 POWER UP 10 3 7 SETTING UP A LITHIUM BATTERY 10 3 8 TESTING THE GENERATOR 15 3 9 CONNECTING THE ATS TO THE INVERTER 16 3 10 SOFTWARE UPDATE 18 4 PROGRAMMING THE INVERTER TO WORK WITH A...

Страница 3: ...d following these instructions 2 SAFETY Use this device only in accordance with this instruction manual as well as all applicable local and national laws and regulations Only allow this device to be i...

Страница 4: ...protected by a circuit breaker and operating on all wires with a distance between contacts of at least 3mm for this unit The unit must be correctly grounded and the supply line must be equipped with a...

Страница 5: ...fety devices 2 Connect communication cable from the batteries to the inverter properly following the battery manufacturer specifications The cables have two ends one to be specifically connected to th...

Страница 6: ...It is recommended to utilize a suitable fuse and DC isolator see next page In some applications switching devices may not be required but overcurrent protectors are still required 3 2 Connecting the L...

Страница 7: ...ximum current of the array connected to each MPPT is 18Amp Before connecting to PV modules install a separate DC circuit breaker between the inverter and PV modules To avoid any malfunction do not con...

Страница 8: ...r between the inverter and PV modules To avoid any malfunction do not connect any PV modules with possible current leakage to the inverter For example grounded PV modules will cause current leakage to...

Страница 9: ...9 3 5 System Diagram Ensure you have used appropriate safety devices in accordance with local wiring regulations WARNING...

Страница 10: ...Battery The first thing to do after the system power up is to check that the lithium battery is communicating correctly with the inverter If it is not communicating with the inverter you need to set...

Страница 11: ...11 1 On the Home Page press the gear icon on the top right corner 2 Click on the Battery icon 3 On the Battery Setup screen...

Страница 12: ...tp solarmd co za inv erter compatibility solarmd sunsynk and solar md SS4074 CAN SS202 CAN Freedomwon Freedom Lite Commercial 52V and HV Models CAN www freedomwon co z a storage 2019 09 free dom lite...

Страница 13: ...nershare Technology BMS48150 RS485 9 PYLON 3 0 RS485 12 Murata RS485 11 GS10000 RS485 3 BPE CAN 0 ABOET CAN 0 VISION Group CAN 13 Alpha CAN 0 Backbone B LFP51 2V 100Ah and B LFP51 2V 125Ah CAN 0 Float...

Страница 14: ...below a Check if your data cable is the correct type b Check if you are plugging the cable into the correct sockets Usually RS 485 is employed but some battery manufacturers use others Some types of l...

Страница 15: ...to automatic 3 Plug the generator into the inverter 4 Switch all isolators on 5 Close the switch 6 The generator should start up automatically 7 Open the switch The generator should stop It is import...

Страница 16: ...tly Both GV and GS can start the generator but this depends upon the setting you select GV and GS are both dry contacts N O normally open For general operation we will use the GV Terminal If you are u...

Страница 17: ...17 If you are using the 8 8kW inverter then this connection would be terminals 7 8...

Страница 18: ...you have it updated You can update the software in three ways 1 Wi Fi data logger 2 GSM data logger 3 Hand held programmer The easiest method is to use a GSM data logger which is simply plugged into...

Страница 19: ...e data logger number and the update can be done remotely When carrying out an update please be patient as it can take some time For very experienced engineers then the update can be done using a handh...

Страница 20: ...mmunicating properly 2 The inverter starts up correctly 3 The generator A T S is functioning correctly 4 The inverter s software is updated Now that you have performed all the connections and all of t...

Страница 21: ...t time and date 1 On the Settings Page press the Basic icon 2 The Basic Setup page will show up on the screen 3 Touch the screen on the variable that you want to change 4 Change the number up and down...

Страница 22: ...51 5 Hz or higher b Lower frequency limit 47 5 Hz or Lower c Lower voltage limit 185V d Higher voltage limit 265V The inverter will lock into the generator If the generator frequency or voltages are o...

Страница 23: ...23 4 3 Setting Up the Batteries To set up your batteries click on the Battery icon on the settings page From here you can configure many settings a Select battery size if not auto set...

Страница 24: ...24 b Max charge and discharge of the batteries c On the Batt Charge sub page select Gen Charge and Gen Signal...

Страница 25: ...charging current This cannot exceed the maximum power of the inverter otherwise it will shut down Also you need to be aware of a C rating of the battery charge and discharge b Battery cables normally...

Страница 26: ...the C Rating may only be 0 1 much lower The second step is to check if the inverter can withstand these values a 3 kW Max 50 Amp b 5 5 kW Max 80 Amp c 8 8 kW max 100 Amp e Set up generator run time a...

Страница 27: ...l cause the inverter will switch o the grid but not shut down completely b Low Battery is battery warning beep c Reset is the battery level the battery needs to reach before the battery will start the...

Страница 28: ...28 1 On this page you need to program the Aux port as a generator port as in the figure below 2 Then select the start stop value for the generator we suggest Start at 35 and Stop at 95...

Страница 29: ...mit power to supply only the loads connected to LOAD port with Limit to Load only What you can do from this page Define a real time to charge or discharge the battery Choose to charge the battery from...

Страница 30: ...30 1 Select the maxiumum power of the inverter a 3 6kW inverter maximum power 3 6kW b 5 5kW inverter maximum power 6kW c 8 8kW inverter maximum power 9kW 2 Select Zero Export and Limit to Load Only...

Страница 31: ...ou are working off grid then you should prioritise the battery b If you are on grid and the generator is just a backup then prioritise the load 4 Select Use Timer This is the real time in which the in...

Страница 32: ...nction will be activated Power this is the maximum power this function will control SOC this is the SOC the battery must reach Grid charge from the grid Gen charge the batteries from the generator Tic...

Страница 33: ...t not all generators are compatible and the system will simply not work Remember that if you are connecting the generator to the Grid port you must fit a CT coil and set the Zero Export feature to aro...

Страница 34: ...inverter c Switch off battery isolator 2 Ensure that a all cable glands are tightened b the inverter cooling system is not obscured c you have completed all mandatory cable tests do not carry out any...

Страница 35: ...erters in parallel then one of the inverters can be used as a charger and another as a discharger To discharge the inverter that is used as a charger it cannot be connected to the parallel circuit Thi...

Страница 36: ...36 You can watch the video for this manual in the link below https www youtube com watch v aYw2 9z0lPM Follow us on social media Sunsynk https www sunsynk org sunsynkofficial energysolutions...

Страница 37: ...ing 171 Wai Yip Street Kwun Tong Kowloon Hong Kong Tel HK 852 2884 4318 Fax 852 2884 4816 Tel UK 44 151 528 9945 Tel SA 27 1108 39837 sales globaltech china com Audio Training manuals on Apple Pod Cas...