31
3) Select what to do with the solar power.
a) If you are working off-grid, then you should prioritise the battery.
b) If you are on-grid and the generator is just a backup, then prioritise the load.
4) Select “Use Timer”. This is the real time in which the inverter will charge or discharge from
the generator.