ECCO SG04LP1 | User Manual
65
The inverter must be installed by a qualified / licensed electrical engineer in accordance to the countries
wiring regulations.
Before switching on, the installation engineer must have completed the Earth Bond, RCD and earth leakage
tests, checked that the solar panel Voc voltage does not exceed 480V and checked the battery voltage.
Power ON Sequence:
1. Switch on AC
2. Press Start Button
3. Switch on Battery and battery breaker
4. Switch on the DC (PV Isolator)
Shutdown Sequence:
1.
Switch off AC
2. Press the start button
3.
Switch off the battery and the battery breaker
4.
Switch off the DC (PV isolator)
7. COMMISSIONING
7.1. Start-Up / Shutdown Procedure
Содержание ECCO SUN-3.6K-SG04LP1-EU
Страница 4: ...ECCO SG04LP1 User Manual 4 APPENDIX A 67 APPENDIX B 68 APPENDIX C 68 APPENDIX D 68 APPENDIX E 69...
Страница 9: ...ECCO SG04LP1 User Manual 9 2 1 Product Size...
Страница 17: ...ECCO SG04LP1 User Manual 17 4 5 Function Port Definition...
Страница 21: ...ECCO SG04LP1 User Manual 21...
Страница 23: ...ECCO SG04LP1 User Manual 23 4 9 1 Recommended AC Surge Protector...
Страница 26: ...ECCO SG04LP1 User Manual 26 4 12 Meter Connection 4 12 1 System Connection for the CHNT Meter...
Страница 27: ...ECCO SG04LP1 User Manual 27 4 13 Wiring System for Inverter...
Страница 30: ...ECCO SG04LP1 User Manual 30 4 16 Single Phase Parallel Connection Diagram 03 02 01...
Страница 31: ...ECCO SG04LP1 User Manual 31 4 17 Three Phase Parallel Inverter 03 02 01...
Страница 62: ...ECCO SG04LP1 User Manual 62 6 OPERATING MODES 6 1 Mode I Basic 6 2 Mode II With Generator...
Страница 63: ...ECCO SG04LP1 User Manual 63 6 3 Mode III With Smart Load 6 4 Mode IV AC Couple...
Страница 64: ...ECCO SG04LP1 User Manual 64...
Страница 70: ...Ltd wered by Po...