SunStar SC10T-1-LP Скачать руководство пользователя страница 8

-7- 

THERMOSTAT OPERATION 

 

After  the  pilot  is  lit,  rotate  the  gas  control  knob  counterclockwise  toward  the  “HI”  setting.    The  “LO”  and  “HI”  settings 
represent  a  temperature  range  of  approximately  55º

 

F  to  90ºF,  respectively.    This  is  the  temperature  at  the  hydraulic 

thermostat bulb (which is located on the back casing, adjacent to the casing bottom).  The owner is advised to determine 
the particular heat setting that is desired for comfort, as heating requirements are different for every owner.  When the 
hydraulic thermostat bulb senses the need for heat, the unit cycles “ON” at a full input. The unit remains at this full input 
until the hydraulic thermostat bulb is “satisfied”.  Then the burner shuts off.  NOTE 1: The burner does not modulate at any 
time during the operation process and ceramic plaques  should be glowing whenever the heater is “ON.”

 

NOTE 2:  If the owner does not want the burner to operate, the control

 Knob must be turned to the "Pilot" or "OFF" position.

 

If the knob is turned to the “LO” setting, the burner will operate if the

 temperature drops to approximately 50ºF.

 

INSTALLATION TO GAS SUPPLY 

 

1.  The  gas  supply  must  comply  with  local  codes,  or  in  their 

absence,  the  installation  must  be  in  accordance  with  the 
American National Standard (National Fuel Gas Code) NFPA 
54,  also  known  as  ANSI  Z223.1  -  latest  edition,  available 
from  the  ANSI,  Inc.,  1434  Broadway,  New  York,  New  York 
10018,  or  the  National  Fire  Protection  Association, 
Batterymarch Park, Quincy, MA  02269. 

 

2. 

WARNING:    When  using  LP  gas,  this  heater  requires  an 

external regulator (not supplied) located between the heater 
and LP Supply Tank.  This regulator must be supplied by the 
installer to reduce incoming LP Gas pressure to a maximum 
of  14  inches  of  water  column.  Under  no  circumstances 
should  this  heater  ever  be  hooked  directly  to  an  LP  supply 
tank.    IMPORTANT:    The  Pressure  Regulator  must  be  held 

with a wrench when connecting gas piping and/or fittings to 
the Pressure Regulator. 

 

3.  Use only new, black iron or rust resistant steel pipe. Copper 

tubing  may  be  acceptable  in  certain  areas.    CHECK  LOCAL 
CODES TO DETERMINE ACCEPTABLE TYPES OF GAS PIPING. 

 

4.  The gas supply line shall be sized and installed to provide a 

sufficient  supply  of  gas  to  meet  the  minimum  demand  of 
the heater without undue loss of pressure. 

 

Typical Installation 

Supply Line 

Up to 20,000 Btu/hr 

3/8" or greater 

Up to 30,000 Btu/hr 

1/2" or greater 

 

5.  The sealant used on the threaded pipe joints of the gas pipe 

must  be  the  specific  type  resistant  to  the  action  of  Liquid 
Petroleum  Gas.    Apply  sealant  lightly  to  male  threads  to 
ensure  excess  sealant  does  not  enter  lines.  Any  excess 
sealant  could  be  forced  into  the  pipe  and  result  in  clogged 
gas valves. 

 

6.  The supply system must include a manual shut-off valve, a 

union  in  the  line,  and  a  plugged  1/8"  NPT  tap.    The  tap 
should be accessible for test gauge connections upstream of 
the gas supply connection to heater. 

 

7.  Include  a  drip  leg  (trap)  in  the  supply  line.    The  purpose  of 

the drip leg is to prevent moisture and contaminants in the 
gas  supply  from  entering  the  heater  controls.    The  drip  leg 
should be readily accessible to permit cleaning or emptying.  
A  drip  leg  should  not  be  located  where  the  condensate  is 
likely  to  freeze.    Failure  to  use  a  drip  leg  can  result  in 
operational difficulties in the heater. 

 

GAS SUPPLY CHECK 

 

A union must be provided directly at the gas inlet to the heater.  
A  manual  gas  valve  must  be  provided  upstream  of  the  union.  
This will allow you to shut off the gas supply to the heater if it is 
necessary to remove it for service purposes. 

 

The  appliance  and  its  appliance  main  shutoff  valve  must  be 
disconnected  from  the  gas  supply  piping  system  during  any 
pressure  testing  of  that  system  at  test  pressures  in  excess  of 
1/2 psig. (3.45kPa). 

 

The  appliance  must  be  isolated  from  the  gas  supply  piping 

system  by  closing  its  equipment  shutoff  valve  during  any 
pressure testing of the gas supply piping system at test pressures 
equal to or less than 1/2 psig. (3.45kPa). 

 

The connectors must be checked and cleaned before assembling 
and then wrenched up tight for a gas tight connection.  Apply a 
soap  and  water  solution  to  all  joints  and  watch  for  bubbles  to 
check  for  gas  leaks.    NEVER  USE  ANY  OPEN  FLAME  TO  CHECK 
FOR GAS LEAKS. 

HEATER MAINTENANCE - PERIODIC VISUAL CHECK 

 

The  burner  must  glow  evenly  over  the  entire  surface  when 
operating correctly.  The pilot flame must burn with a clear blue 
flame.  See Figures 3 and 4.

 

 

 

 

Figure 3 

Содержание SC10T-1-LP

Страница 1: ...ance CONSUMER Retain this manual for future reference This is an unvented gas fired heater It uses air oxygen from the room in which it is installed Provisions for adequate combustion and ventilation air must be provided Refer to the section titled Combustion and ventilation air requirement This appliance may be installed in an aftermarket permanently located manufactured mobile home where not pro...

Страница 2: ...t install this heater at altitudes above 5000 ft because shutdown of the heater by the ODS system may occur due to reduced oxygen levels at these altitudes 5 This appliance is only for use with the type of gas indicated on the nameplate THIS APPLIANCE IS NOT CONVERTIBLE FOR USE WITH OTHER GASES Please check the gas type shown on the heater nameplate prior to hooking the heater to the gas supply 6 ...

Страница 3: ...tu hr of gas consumption for the total input rating of all gas equipment in the space 18 This heater shall not be installed in a room or space unless the required volume of indoor combustion air is provided by the method described in the National Fuel Gas Code ANSI Z223 1 NFPA 54 the International Fuel Gas Code or applicable codes 19 WARNING If the area in which the heater may be operated does not...

Страница 4: ..._ x 20 Btu hr ____________________ Btu hr STEP 3 Add the Btu hr inputs of all fuel burning appliances in this space NOTE DO NOT include Direct Vent gas appliances because these have sealed combustion systems that draw combustion air from outdoors Examples of appliances to consider include gas ranges gas water heaters gas logs kerosene heaters etc Proposed Vent Free Heater _________________________...

Страница 5: ... odorant in escaped gas can adsorb or absorb onto or into walls masonry and other materials and fabrics in a room That will take some of the odorant out of the gas reducing its odor intensity LP Gas may stratify in a closed area and the odor intensity could vary at different levels Since it is heavier than air there may be more odor at lower levels Always be sensitive to the slightest gas odor If ...

Страница 6: ...hen facing the front of the heater the clearance from any combustible materials must be a minimum of 10 from the left 10 from the right 36 from the top and 2 from the bottom Never install the heater in front of any flammable object especially do not place curtains furniture clothing or other flammable objects less than 36 from the front of the heater FLOOR MOUNT INSTALLATION This heater is designe...

Страница 7: ...according to the dimensions shown on the upper corner of Figure 2 1 3 Drill another 5 16 hole on the wall stud for the lower mounting point 4 Screw in the three 3 plastic expansion anchors furnished with the unit as shown in Figure 2 1 5 Screw in the furnished screws to the anchors for the upper mounting points and hang the heater on the screws as shown in Figure 2 1 6 Fasten the bottom of the hea...

Страница 8: ... gas supply line shall be sized and installed to provide a sufficient supply of gas to meet the minimum demand of the heater without undue loss of pressure Typical Installation Supply Line Up to 20 000 Btu hr 3 8 or greater Up to 30 000 Btu hr 1 2 or greater 5 The sealant used on the threaded pipe joints of the gas pipe must be the specific type resistant to the action of Liquid Petroleum Gas Appl...

Страница 9: ...ating season If your pilot will not stay lit try cleaning it Use a can of compressed air such as is used to clean a computer to blow dust out of the pilot assembly Sometimes just blowing air back through the pilot will get rid of the dirt If that fails to solve the problem remove the wire clip that holds the metal strip onto the pilot assembly Remove the cover and blow any dust out Reassemble and ...

Страница 10: ... and it will pop back up Pilot should remain Iit If it goes out repeat steps 3 through 7 If knob does not pop up when released stop and inmediately call your service technician or gas supplier If the pilot will not stay lit after several tries turn the gas control knob to the OFF position and call your service technician or gas supplier 8 Attention Gas control has an INTERLOCK device When the pilo...

Страница 11: ...gas valve BURNER DOES NOT LIGHT Pilot stays lit Burner orifice clogged Burner orifices not correct size Extremely low inlet gas pressure Gas valve is defective Clean or replace orifices Replace with correct size Contact gas supplier Replace gas valve IMPROPER BURNER PATTERN Slight smoke or odor during initial operation Residues from manufacturing process or dust Problem will be eliminated after a ...

Страница 12: ...ater so that the solid portion of the base is facing towards the front of the heater using four 4 No 10 x 1 screws provided 4 Attach a field supplied pipe elbow 3 8 NPT thread to the bottom of the heater for connection to the gas line as shown in the figure below and as instructed previously in these instructions WARNING This heater must be installed on a wall whenever it is installed in a bedroom...

Страница 13: ... the parts in accordance with these diagrams or failure to use only parts specifically approved with this heater may result in property damage or personal injury REPAIR PARTS LIST MODELS SC10T 1 LP Propane Gas SC10T 1 NG Natural Gas ...

Страница 14: ...LS SC10T 1 LP Propane Gas SC10T 1 NG Natural Gas WARNING Failure to position the parts in accordance with these diagrams or failure to use only parts specifically approved with this heater may result in property damage or personal injury ...

Страница 15: ...590050 Connector 10 43596010 43596010 Control Valve 11 43590050 43590050 Connector 12 43585830 43585830 Tubing Regulator to Tap 13 43585850 43585850 Tubing Valve to Distributor T 14 43585880 Tubing Valve to Pilot 15 43591010 43591010 Distributor T 16 43585840 43585840 Tubing Distributor T to First Setting 17 43585840 43585840 Tubing Distributor T to First Setting 18 43601070 43601070 Shoulder Ther...

Страница 16: ...15 Manufactured for SUNSTAR HEATING PRODUCTS INC 306 West Tremont Avenue Charlotte NC 28203 4946 704 372 3486 ...

Отзывы: