Sunshine Solar Evacuated Tube Solar Water Heater Скачать руководство пользователя страница 6

 

 

 Copyright 2013 

0800 sunshine  |  

[email protected]

  |  www.sunshinesolar.co.nz |

 6

 

 

 

Section 2: 

General guidelines for roof-mounting of the solar collectors. 

  

 

The ideal location for the Solar Collectors is on a roof facing the mid-day / early afternoon sun.  (North / NNW 

in New Zealand). 

 

The panel angle to the sun should be approximately the same as the geographical latitude (e.g. 36° for Auckland, 

45° for Dunedin). 

 

If  the  roof  pitch  is  significantly  less  than  this  value,  we  recommend  that  the  panel  is  elevated  on  a  frame  to 
maximise the collector efficiency. 

 

Clients will have a view on the use of a frame; it is important to explain to them (in writing) that Sunshine Solar 

does  recommend  a  frame  in  these  circumstances  to  maximise  efficiency,  especially  in  higher  value  latitudes  
(eg Dunedin). 

 

It is important also that the panels will not be shaded for any of the day in summer or winter by trees or buildings etc.  

Pitch roof – elevated  

Pitch roof – flat to roof  

Flat roof – elevated 

 

 

Stainless steel fittings of an appropriate grade must be used, including roof mounting screws. 

 

Roof  cladding  penetrations  must  be  appropriately  sealed  according  to  local  building  code  standards  and  must 
follow good practice at all times. 

 

 

Содержание Evacuated Tube Solar Water Heater

Страница 1: ...Tube Solar Water Heaters Sunshine Solar water heaters are AS NZ 2712 2007 certified Please read the following instructions carefully to ensure their correct installation for optimum results If you hav...

Страница 2: ...to the cylinder Contents Page 3 Section 1 Specifications and cautions 6 Section 2 General guidelines for roof mounting of the solar collectors 7 Section 3 Collector assembly 9 Section 4 Frame assembl...

Страница 3: ...Copyright 2013 0800 sunshine john sunshinesolar co nz www sunshinesolar co nz 3 Section 1 Specifications and cautions Dimensions of the solar collectors ET20 20 tube and ET30 30 tube ET20 ET30...

Страница 4: ...s to the manifold box 3 Cover Stabilises the heat pipe and minimises the thermal energy loss from the glass tube 4 Conductive Aluminium fins Transfer the thermal energy from the glass inner wall to th...

Страница 5: ...licable Health and Safety guidelines at all time 1 7 The solar collector should be installed within 22 500 angle 1 8 The weight bearing capacity of the roof MUST be calculated for the maximum collecto...

Страница 6: ...a frame to maximise the collector efficiency Clients will have a view on the use of a frame it is important to explain to them in writing that Sunshine Solar does recommend a frame in these circumsta...

Страница 7: ...g each other ET30 only For the central vertical frame piece ONLY place the top clip at this stage 1a Vertical tracks the manifold end has the holes for the brackets further apart picture showing manif...

Страница 8: ...cap has NOT clipped in securely as in the photo the manifold will have to be adjusted up to allow the end cap to click into place 8 Now the manifold clips can be tightened ON THIS SIDE ONLY because t...

Страница 9: ...on 3 should be cut to the desired length Both sections must be fitted to the collector frame using the stainless steel M8 bolts provided The bolt holes should be drilled carefully to avoid scarring th...

Страница 10: ...Copyright 2013 0800 sunshine john sunshinesolar co nz www sunshinesolar co nz 10 Section 5 Roof fixings...

Страница 11: ...er see diagram 7 Ensure the pump has enough support and is installed in a vertical position accessible for replacement and adjustment of settings 8 Connect Tempering valve if required to hot and cold...

Страница 12: ...e control 8 Connect power to controller relay is a switch do NOT connect an outside live to relay 9 Switch on and test 10 For overheat dump option connect pipe thermostat live comes from P1 connection...

Страница 13: ...irmly and completely into the manifold 3 Next slide the loose copper collar up 4 Slide up the black plastic tube mount which then screws firmly onto the manifold 5 Then ease the evacuated tube gently...

Страница 14: ...press SET and then to make this 0100 press set twice until it has a temperature 40 Press plus to increase this to 50 Press ESC then display should say TH1F change this to 0700 and 60C in the same way...

Страница 15: ...lted it Ensure that copper is used where this can occur NB heat can travel up the cold supply pipe when the whole cylinder is HOT May require thermal trap on the cold supply bare copper pipe in a loop...

Страница 16: ...el 1 and 2 frost protection if in areas of long term below zero temperatures a closed loop system is advised D Guards to the collectors may be required in areas of vandalism or large hail zones Sydney...

Страница 17: ...eview controller settings Clean up the site from boxes wires etc Important Paperwork Complete Code of Compliance for council Complete Council specific PS3 documentation Complete warranty details in Ow...

Отзывы: