Section 10: 

Limitations and clauses

—required for AS2712:2007 2.9.1

 

A.

 

The solar water heater, parts and fittings are usable up to 10 bar pressure / 1000kPA. 

 

The system is made of copper so pool levels of chlorine are not acceptable for use. 

 

For levels of high lime content please check the element in cylinder is incalloy otherwise Sunshine solar  
panels are capable of handling poor water quality. 

B.

 

I   The water heater will be installed in accordance with AS/NZS3500.4 including insulation and piping. 

 

 

Copper piping should be used only, throughout install as per attached instructions. 

 

II   Cylinders to be installed so to allow for draining of system, water expansion and relief of vacuum  

as per AS/NZS3500.4. 

 

III   Drain trays to be installed as per AS/NZS3500.4, where required. 

 

IV   N/a. 

 

V   In case of hard water buildup of lime may occur on hot areas, ensure element type is suitable for  

the water type otherwise softening of water may be required. 

C.

 

The system is designed for level 1 and 2 frost protection, if in areas of long term below zero temperatures  

a closed loop system is advised. 

D.

 

Guards to the collectors may be required in areas of vandalism or large hail zones (Sydney). 

E.

 

In areas of cyclonic conditions specific engineering design is required; refer to Installation Handbook rev B  

for limitations. Panels weigh 18.8kg/m2 when fill of water. 

F.

 

For full installation including roof structure spacing please refer to Engineering Installation manual, purlin  

tables etc. Solar to be installed as to not compromise the structural integrity of the building. 

G.

 

Ensure appropriate fixings per roof type as contained in this manual, for roof types outside of these then  
refer to engineering manual otherwise specific engineer design required. 

H.

 

Controller manual to be supplied to customer (which has a boost instruction highlighted). 

I.

 

Controller manual to be supplied with the default (printed settings of the thermostats). 

J.

 

Follow the finishing off instructions contained for commissioning of the system. 

K.

 

Ensure that all systems have an appropriately solar capable tempering valve and this is set to 55C or 45C  

for elderly, schools and preschools applications. We recommend a 20mm + tempering valve for all low 

pressure applications. 

 

 

Содержание Evacuated Tube Solar Water Heater

Страница 1: ...Tube Solar Water Heaters Sunshine Solar water heaters are AS NZ 2712 2007 certified Please read the following instructions carefully to ensure their correct installation for optimum results If you hav...

Страница 2: ...to the cylinder Contents Page 3 Section 1 Specifications and cautions 6 Section 2 General guidelines for roof mounting of the solar collectors 7 Section 3 Collector assembly 9 Section 4 Frame assembl...

Страница 3: ...Copyright 2013 0800 sunshine john sunshinesolar co nz www sunshinesolar co nz 3 Section 1 Specifications and cautions Dimensions of the solar collectors ET20 20 tube and ET30 30 tube ET20 ET30...

Страница 4: ...s to the manifold box 3 Cover Stabilises the heat pipe and minimises the thermal energy loss from the glass tube 4 Conductive Aluminium fins Transfer the thermal energy from the glass inner wall to th...

Страница 5: ...licable Health and Safety guidelines at all time 1 7 The solar collector should be installed within 22 500 angle 1 8 The weight bearing capacity of the roof MUST be calculated for the maximum collecto...

Страница 6: ...a frame to maximise the collector efficiency Clients will have a view on the use of a frame it is important to explain to them in writing that Sunshine Solar does recommend a frame in these circumsta...

Страница 7: ...g each other ET30 only For the central vertical frame piece ONLY place the top clip at this stage 1a Vertical tracks the manifold end has the holes for the brackets further apart picture showing manif...

Страница 8: ...cap has NOT clipped in securely as in the photo the manifold will have to be adjusted up to allow the end cap to click into place 8 Now the manifold clips can be tightened ON THIS SIDE ONLY because t...

Страница 9: ...on 3 should be cut to the desired length Both sections must be fitted to the collector frame using the stainless steel M8 bolts provided The bolt holes should be drilled carefully to avoid scarring th...

Страница 10: ...Copyright 2013 0800 sunshine john sunshinesolar co nz www sunshinesolar co nz 10 Section 5 Roof fixings...

Страница 11: ...er see diagram 7 Ensure the pump has enough support and is installed in a vertical position accessible for replacement and adjustment of settings 8 Connect Tempering valve if required to hot and cold...

Страница 12: ...e control 8 Connect power to controller relay is a switch do NOT connect an outside live to relay 9 Switch on and test 10 For overheat dump option connect pipe thermostat live comes from P1 connection...

Страница 13: ...irmly and completely into the manifold 3 Next slide the loose copper collar up 4 Slide up the black plastic tube mount which then screws firmly onto the manifold 5 Then ease the evacuated tube gently...

Страница 14: ...press SET and then to make this 0100 press set twice until it has a temperature 40 Press plus to increase this to 50 Press ESC then display should say TH1F change this to 0700 and 60C in the same way...

Страница 15: ...lted it Ensure that copper is used where this can occur NB heat can travel up the cold supply pipe when the whole cylinder is HOT May require thermal trap on the cold supply bare copper pipe in a loop...

Страница 16: ...el 1 and 2 frost protection if in areas of long term below zero temperatures a closed loop system is advised D Guards to the collectors may be required in areas of vandalism or large hail zones Sydney...

Страница 17: ...eview controller settings Clean up the site from boxes wires etc Important Paperwork Complete Code of Compliance for council Complete Council specific PS3 documentation Complete warranty details in Ow...

Отзывы: