Section 11:
Important Checklist for Installer
(To complete and tick before leaving site)
Please ask customer to be available at the end of the day/estimated completion time for commissioning and
to go through the paperwork.
Otherwise this can be discussed by phone or if another appointment is necessary a call out fee may be applied.
Important Checks
Check for leaks
Ensure probes have good contact
Ensure pump works
Check heating element switches on and off
Controller programmed
System debrief with customer and review controller settings
Clean up the site from boxes, wires, etc.
Important Paperwork
Complete Code of Compliance for council
Complete Council specific PS3 documentation
Complete warranty details in Owner’s Manual
Leave system manuals for customer
Electrical CoC form left with customer documents
If commissioning is not possible because the customer is absent please leave your contact details to make
another time or discuss via a phone call.
Dear Customer
Unfortunately in your absence we were unable to go over some of the paperwork and commission your system with
you. If you would like to discuss anything further please call me to make a time or go over these on the phone. Please
note if another appointment is necessary a call out fee may be applied.
Installer:
Date:
Notes:
Phone: