VI
4.6.1 Preparation before Mounting ............................................................ 20
4.7.1 Preparation before Mounting ............................................................ 22
............................................................................... 25
5.4.1 Additional Grounding Requirements.................................................. 29
5.4.2 Connection Procedure ...................................................................... 29
5.5 Opening the Wiring Compartment .............................................................. 30
5.6.1 AC Side Requirements ...................................................................... 31
5.6.2 Requirements for OT/DT Terminal ..................................................... 33
5.6.3 Aluminium Cable Requirements ........................................................ 34
5.6.4 Connection Procedure ...................................................................... 34
5.7.3 Connection Procedure ...................................................................... 40
5.7.4 Installing the PV Connectors ............................................................. 42
5.8 Wiring of Tracking System Power Cable (Optional) ..................................... 44
5.9.2 RS485 Communication System ........................................................ 48
5.9.3 Connection Procedure(Terminal Block) ............................................. 50
5.10 PLC Communication Connection .............................................................. 51
Содержание SG250HX
Страница 2: ......
Страница 6: ......
Страница 10: ......
Страница 65: ...55 E En nd d User Manual 5 Electrical Connection...