System Manual
6 Electrical Installation
41
6.12
Finishing Electrical Connection
After the electrical connection, check the connection of all cables. Make sure all
connections are correct and firm.
After checking that all connections are correct and firm,
Tighten all the cable entries.
The gap at the cable inlet/outlet at the bottom of the MV Station should be sealed with
fireproof mud or other appropriate materials.
Water-proof treatment should be done on the foundation of the MV Station.
Содержание SG2500U-MV
Страница 1: ...SG2500U MV V11 SEN Ver10 201805 SG2500U MV MV Turnkey Station System Manual...
Страница 2: ......