4.3
Installation Environment Design ..................................................................................................... 21
4.3.1
Floor ....................................................................................................................................... 21
4.3.2
Clarence Space ...................................................................................................................... 22
4.3.3
Cable Trench .......................................................................................................................... 22
4.3.4
Ventilation............................................................................................................................... 23
4.3.5
Other Protections ................................................................................................................... 23
4.4
Wiring Specification ........................................................................................................................ 24
4.5
Tightening Torques and Cable Protection....................................................................................... 25
4.5.1
Tightening Torques for Power Cable Connections................................................................. 25
4.5.2
Cable Protections ................................................................................................................... 25
4.6
Installation Process......................................................................................................................... 25
5 Preparations for Installation .............................................................................. 27
5.1
Checking the Unit ........................................................................................................................... 28
5.2
Required tools................................................................................................................................. 28
6 Mechanical Installation....................................................................................... 29
6.1
Transport and Shipping................................................................................................................... 30
6.1.1
Attentions................................................................................................................................ 30
6.1.2
Moving the Packed SG100KU ............................................................................................... 31
6.2
Field Installation.............................................................................................................................. 35
6.2.1
Unpacking the Unit ................................................................................................................. 35
6.2.2
Place the SG100KU ............................................................................................................... 36
6.2.3
Fastening the SG100KU to the floor ...................................................................................... 36
7 Electrical Connection........................................................................................... 37
7.1
Cable Specifications ....................................................................................................................... 38
7.2
Parts for Cabling ............................................................................................................................. 39
7.3
Start Electrical Connections............................................................................................................ 40
7.3.1
Open the Door........................................................................................................................ 40
7.4
Open the Cable Entry/Exit Holes.................................................................................................... 41
7.5
DC Connections.............................................................................................................................. 42
7.6
AC Grid Connections ...................................................................................................................... 44
7.7
Ground Connections....................................................................................................................... 45
7.8
Communication Connection (Optional)........................................................................................... 47
7.9
Close the Cable Entry/Exit Holes ................................................................................................... 48
8 Installation Checklist........................................................................................... 49
9 Commissioning..................................................................................................... 51
9.1
Requirements of Commissioning.................................................................................................... 52
9.2
Inspection before Start-up............................................................................................................... 52
Содержание SG100KU
Страница 1: ...SG100KU PV Grid Connected Inverter Installation Manual SG100KU IEN Ver13 201308 Version 1 3...
Страница 2: ......
Страница 21: ...11 3 Introduction About This Chapter This chapter provides basic information about SG100KU...
Страница 70: ......