![Sungrow SG100KU Скачать руководство пользователя страница 50](http://html1.mh-extra.com/html/sungrow/sg100ku/sg100ku_installation-manual_1396644050.webp)
SG100KU
Installation Manual
40
7.3
Start Electrical Connections
7.3.1
Open the Door
The SG100KU is stopped and latched during shipping; users must open the front door
of SG100KU for wiring.
1. Switch off both the AC and DC main switches (turn both the switches
counter-clockwise).
Fig 7-2 Open the Main Switches
2. Press down the doorlock to release the latch handle and turn the handle
clockwise.
Fig 7-3 Open the Latch
3. First open the left half door and then the right half door, identify the 2 transparent
plastic shields (one in the upper position and one in the lower position).
4. It is necessary to take down the lower protective shield for wiring.
Note that there are 4 screws (in the blue circle) to fix the shield, loose and take
down them all. See Fig 7-4.
Содержание SG100KU
Страница 1: ...SG100KU PV Grid Connected Inverter Installation Manual SG100KU IEN Ver13 201308 Version 1 3...
Страница 2: ......
Страница 21: ...11 3 Introduction About This Chapter This chapter provides basic information about SG100KU...
Страница 70: ......