Sundyne Corporation
http://www.sundyne.com
ii
Contents
CONTENTS ......................................... II
INTRODUCTION & SAFETY ............... 1
Text Symbols
........................................... 1
Equipment and Safety Precautions
.. 1
Wearing Personal Protective
Equipment
............................................. 2
Using Forklifts
....................................... 2
Ensuring Electrical Safety
................... 2
Testing Equipment
............................... 2
Using Chemicals
.................................. 2
Protection from Falling
........................ 2
Preventative Machine Guards
............ 2
TRANSPORT AND STORAGE ........... 3
Inspection
................................................. 3
Storing Your Pump Short-Term
......... 3
Storing Your Pump Long-Term
.......... 3
PRODUCT DESCRIPTION .................. 4
Sundyne Centrifugal Pumps
............... 4
INSTALLATION ................................... 5
Suction and Discharge Piping
............ 5
Diffuser Cavity Vent
.............................. 5
Seal Environmental Control System
. 6
Liquid Buffer System
............................ 6
Mounting Vertical Units Without
Stands
....................................................... 6
Mounting Vertical Units with Stands
(LMV)
......................................................... 7
Base Mounted (BMP) Units
................. 7
Driver and Coupling
.............................. 7
Flexible Coupling for LMV Units
Without a Vertical Stand
....................... 7
Lube System
............................................ 8
Gearbox Heat Exchanger
..................... 8
Oil Manifolds
......................................... 9
Remote Heat Exchanger
..................... 9
Gearbox Sump
........................................ 9
SundGard
®
Oil Filter
............................ 10
Main Lube Pump and Lube Oil
Priming Kit
............................................. 10
Oil Pressure
........................................... 11
COMMISSIONING, START UP, &
OPERATION ...................................... 12
Pre-Commissioning
............................. 12
Familiarizing Yourself with the Pump
............................................................... 12
Driver Instructions
.............................. 12
Verifying Auxiliaries
............................ 12
Installing a Seal Environmental
Control System
................................... 12
Checking Driver Rotation
.................. 12
Piping Connections
............................ 12
Pre-Start Up
........................................... 13
Pressurizing the Fluid Loop
.............. 13
Servicing the Gearbox
....................... 13
Auxiliary Lube Pump
.......................... 13
Setting the Valves
.............................. 13
Operating Conditions
.......................... 13
Verifying Operating Conditions
........ 13
Adjusting the Cooling Flow
............... 13
Содержание LMV-313
Страница 1: ...SUNDYNE LMV 313 PUMPS Instruction and Operation Manual August 2007 ...
Страница 36: ...Instruction and Operation Manual 32 Figure 15 Inducer Housing Shim Adjustment ...
Страница 40: ...Instruction and Operation Manual 36 Figure 17 Service Check Points ...
Страница 69: ...Instruction and Operation Manual 65 Figure 22 Gearbox Components ...
Страница 70: ...Instruction and Operation Manual 66 Figure 23 Pump Nomenclature ...
Страница 71: ...Instruction and Operation Manual 67 Figure 24 Exploded View ...
Страница 72: ...Instruction and Operation Manual 68 Shaft Assemblies Figure 25 Shaft Assemblies ...
Страница 74: ...Instruction and Operation Manual 70 Single Seal Arrangement and Parts Figure 27 Single Seal Arrangement ...
Страница 76: ...Instruction and Operation Manual 72 Double Seal Arrangement and Parts Figure 28 Double Seal Arrangement ...
Страница 78: ...Instruction and Operation Manual 74 Tandem Seal Arrangement and Parts Figure 29 Tandem Seal Arrangement ...