CANOPY INSTALLATION
4
Remove packing and unit from
box marked
TOP UNIT
. Lift
top into position (acrylic facing
down). The bolts should
protrude through the holes of
the mounting bracket in the leg
assemblies. The canopy is
secured to the leg assemblies
using eight (8) 5/16” nuts (four
on each leg).
Note: For proper balancing
and limited spring adjustment
of the canopy, the bolts of the
canopy should rest against the
top of the holes in the
mounting bracket of the leg
assembly. Ignoring this
recommendation will allow the
canopy to move to the closed
position and not remain open
(the canopy will require two
individuals to install and secure
into position. The addition of a
third person will simplify the
procedure of securing the
“Canopy” to the legs).
Содержание 20 GENESIS System 332 Pro-1
Страница 1: ......
Страница 7: ...CONTENTS LEG POWER BOX MIDDLE FACADE FRONT FACADE BASE CANOPY POWER BOX COVER ...
Страница 17: ...CANOPY SERVICE PARTS EXPLOSION ...
Страница 20: ...LEG MIDDLE FAÇADE SERVICE PARTS EXPLOSION ...