![Sun Oracle Sun Blade 6000 Скачать руководство пользователя страница 21](http://html.mh-extra.com/html/sun-oracle/sun-blade-6000/sun-blade-6000_site-planning-manual_1393108021.webp)
15
Facility Safety
Observe the following guidelines and precautions when installing the Sun Blade 6000
modular system.
■
“Secure Installation Requirements” on page 15
■
“Placement of Product” on page 15
■
“Hazardous Conditions Precaution” on page 16
Secure Installation Requirements
To minimize personal injury in the event of a seismic occurrence, you must securely
fasten the cabinet in which the system is rackmounted to a rigid structure extending
from the floor to the ceiling, or from the walls, of the room in which the cabinet is
located.
Install a stand-alone system or a rackmounted system on a level surface. At the base
of the cabinet is an anti-tilt bar. This bar must be extended before you install the Sun
Blade 6000 modular system to prevent the cabinet from moving.
Placement of Product
Do not block or cover the openings of the Sun Blade 6000 modular system. Never
place an Oracle product near a radiator or heat register.
Failure to follow these guidelines can cause overheating and affect the reliability of
your Oracle product. Air cools the Sun Blade 6000 modular system from front to
back. The front and rear cabinet door clearances must provide sufficient space for
cooling. See
“Airflow Requirements” on page 10
for specific clearance specifications.
Содержание Sun Blade 6000
Страница 1: ...Sun Blade 6000 Modular System Site Planning Guide Part No E20776 02 February 2012 ...
Страница 10: ...4 Site Planning Guide for Sun Blade 6000 and Sun Blade 6048 Modular Systems February 2012 ...
Страница 18: ...12 Site Planning Guide for Sun Blade 6000 and Sun Blade 6048 Modular Systems February 2012 ...