67
Index
A
acoustic noise emissions, 10
adapters for serial cables, 49
airflow requirements, 11
B
baud rate for serial terminal, 57
bits setting for serial terminal, 57
booting the system, 55
buttons,
See
"slide rail assembly locks"
C
cable management assembly, 46
cables
adapters for serial data cables, 49
clearance, 5
D
diagnostics, when run, 58
F
first time AC power, 55
H
handshaking for serial terminal, no, 57
hot-plugging USB ports, 48
I
installing
mounting brackets, 34
installing optional components, 21
L
levers, locking,
See
"slide rail assembly locks"
locating pins for mounting brackets, 34
locks,
See
"slide rail assembly locks"
M
minimum cable connections, 47
modem not for use with the SER MGT serial
management port, 49
mounting bracket
locating pins on chassis, 34
preparation for installation, 34
removing from slide rail, 34
unlocking, 34
mounting screws for rack, 31
P
parity for serial terminal, no, 57
pins, mounting bracket locating, 34
powering on the system for the first time, 55
R
RJ-45 cable, 47
S
screws for rack mounting, 31
service processor
powering on for the first time, 57
slide rail assembly locks illustrated
front slide rail locks, 28
middle section lever, 29
mounting bracket locating pin lock, 31
mounting bracket release button, 28
slide rail spacing tool, 32
spacing tool for slide rails, 32
specifications
acoustic, 10
airflow, 11
compliance, 10
Содержание SPARC T3-1
Страница 1: ...SPARC T3 1 Server Installation Guide Part No E21414 04 March 2012 ...
Страница 5: ...Contents v Glossary 63 Index 67 ...
Страница 6: ...vi SPARC T3 1 Server Installation Guide March 2012 ...
Страница 30: ...22 SPARC T3 1 Server Installation Guide March 2012 ...
Страница 70: ...62 SPARC T3 1 Server Installation Guide March 2012 ...
Страница 74: ...66 SPARC T3 1 Server Installation Guide March 2012 ...