![Sun Oracle SPARC T3-1 Скачать руководство пользователя страница 53](http://html1.mh-extra.com/html/sun-oracle/sparc-t3-1/sparc-t3-1_installation-manual_1393147053.webp)
Installing the Server
45
Note –
The CMA includes velcro straps to secure the cables inside the CMA. Do not
install the velcro straps until you have installed the CMA, connected the cables, and
placed the cabling inside the CMA.
Tip –
Two people are needed for this procedure, one to move the server in and out
of the rack, and one to observe the cables and CMA.
1. For a free-standing rack, deploy the antitilt bar.
2. Unlock the slide lock buttons at the right and left sides of the chassis.
FIGURE:
Unlocking the Slide Rail Assembly
3. If the server cables have been placed inside the CMA, inspect them for binding
or kinks.
4. Slowly pull the server out of the rack until the slide rails reach their stops.
5. Verify that the CMA extends fully and does not bind in the slide rails.
6. Verify that the server extends fully and locks in the maintenance position.
The server should stop after approximately 15 in. (40 cm) of travel.
Содержание SPARC T3-1
Страница 1: ...SPARC T3 1 Server Installation Guide Part No E21414 04 March 2012 ...
Страница 5: ...Contents v Glossary 63 Index 67 ...
Страница 6: ...vi SPARC T3 1 Server Installation Guide March 2012 ...
Страница 30: ...22 SPARC T3 1 Server Installation Guide March 2012 ...
Страница 70: ...62 SPARC T3 1 Server Installation Guide March 2012 ...
Страница 74: ...66 SPARC T3 1 Server Installation Guide March 2012 ...