Chapter 3
Setting Up the System
29
3. Turn the front panel keyswitch to the Power-On/Off position.
Insert the system key into the keyswitch (if necessary).
4. Press the front panel Power button once.
Note –
The system may take anywhere from 30 seconds to two minutes before video
is displayed on the graphics console, or the OK prompt appears on an attached
terminal. This time depends on the level of power-on self-test (POST) diagnostics
being performed.
Power-On/Off position
Содержание SUN FIRE 280R
Страница 8: ...viii Sun Fire 280R Server Setup and Rackmounting Guide January 2001...
Страница 26: ...18 Sun Fire 280R Server Setup and Rackmounting Guide January 2001...
Страница 35: ...Chapter 3 Setting Up the System 27 5 Connect the mouse USB cable to a USB port on the back panel...
Страница 40: ...32 Sun Fire 280R Server Setup and Rackmounting Guide January 2001...