19
C H A P T E R
3
Setting Up the System
This chapter explains how to attach all the cords and cables needed to get the server
up and running. Where software is involved, this chapter explains some of what you
need to do, and points you to the appropriate software manuals for the rest of the
information.
Complete the following tasks to finish setting up your system:
■
“Connect the Power Cord” on page 20
■
“Connect the Twisted-Pair Ethernet (TPE) Cable” on page 22
■
“Install a System Console” on page 23
■
“Restore the Rack Enclosure” on page 28
■
“Power On the System” on page 28
■
“Install the Operating System” on page 31
■
“Install Online Documentation” on page 31
If you need to power off your system, see the
Sun Fire 280R Server Owner’s Guide.
Содержание SUN FIRE 280R
Страница 8: ...viii Sun Fire 280R Server Setup and Rackmounting Guide January 2001...
Страница 26: ...18 Sun Fire 280R Server Setup and Rackmounting Guide January 2001...
Страница 35: ...Chapter 3 Setting Up the System 27 5 Connect the mouse USB cable to a USB port on the back panel...
Страница 40: ...32 Sun Fire 280R Server Setup and Rackmounting Guide January 2001...