Index-6
Sun Blade 150 Service Manual • June 2002
system dimensions, 1–4
system functional block diagram, C–2
system functional descriptions, C–1
system power switch, 9–2
system reset, 4–10
system specifications, A–1
T
telephone support, 1–xxiv
temperature requirements, A–3
test command
timing
TIP connection, setting up, 3–3
tools required, 5–4
TPE
cable compatibility, B–7
connector signal descriptions, B–6
troubleshooting
troubleshooting procedures, 4–1
U
UNIX commands
and power levels, C–26
PCIO-2 ASIC functional description, C–11
Sun USB web site, E–1
using devices, E–1
USB keyboard
V
validation test suite
validation test suite (SunVTS), 2–1
verifying baud rate, 3–4
video connector
W
watch-clock diagnostic, 4–5
watch-net diagnostic, 4–6
watch-net-all diagnostic, 4–6
wrist strap
Содержание SUN BLADE 150
Страница 16: ...xvi Sun Blade 150 Service Manual June 2002...
Страница 20: ...xx Sun Blade 150 Service Manual June 2002...
Страница 26: ...xxvi Sun Blade 150 Service Manual June 2002...
Страница 28: ...1 2 Sun Blade 150 Service Manual June 2002 FIGURE 1 1 Sun Blade 150 System...
Страница 90: ...5 8 Sun Blade 150 Service Manual June 2002...
Страница 108: ...6 18 Sun Blade 150 Service Manual June 2002...
Страница 122: ...7 14 Sun Blade 150 Service Manual June 2002...
Страница 140: ...8 18 Sun Blade 150 Service Manual June 2002...
Страница 144: ...9 4 Sun Blade 150 Service Manual June 2002...
Страница 158: ...A 10 Sun Blade 150 Service Manual June 2002...
Страница 169: ...Appendix B Signal Descriptions B 11 FIGURE B 9 Serial and Video Port Connector Extensions...
Страница 204: ...D 4 Sun Blade 150 Service Manual June 2002...