1-16
StorEdge L280 Service Manual • February 1998
1.4
Powering on the System
Caution –
To disconnect primary power, pull the power cord from the wall
receptacle. The switch on the front of the unit shuts down secondary circuits only.
Caution –
Make certain that reliable earth grounding of the rackmounted
equipment and the power tap is maintained.
Caution –
Be certain that the total current of the rack components does not exceed
the current rating of the power tap or outlet receptacle.
1. Connect the power cord into a grounded outlet.
2. Using a screwdriver or pencil, turn the power on by pushing the standby (power)
switch, located on the bottom of the front access door.
Initially the messages
NOT READY/SELF TEST
,
NOT READY/INVENTORY CHECK
, and
NOT READY/CHECK DRIVE
will alternately be displayed on the front panel. After the
power-on test completes (approximately 30 seconds), the drive status information is
displayed in the panel window.
Note –
If you have problems powering on the unit, see TABLE 4-4 on page 4-11.
3. Turn on any other peripherals.
Set SCSI IDs as required. See Section 4.4.1, “Setting SCSI IDs,” on page 4-4.
4. Turn on the host or system.
5. Boot system up and load backup software to begin the backup operation.
!
!
Содержание StorEdge L280
Страница 10: ...x StorEdge L280 Service Manual February 1998 ...
Страница 11: ...xi ...
Страница 12: ...xii StorEdge L280 Service Manual February 1998 ...
Страница 16: ...xvi StorEdge L280 Service Manual February 1998 ...
Страница 20: ...xx StorEdge L280 Service Manual February 1998 TABLE 5 3 Solenoid Mechanism 5 10 ...
Страница 44: ...1 20 StorEdge L280 Service Manual February 1998 ...
Страница 52: ...2 8 StorEdge L280 Service Manual February 1998 ...
Страница 86: ...4 22 StorEdge L280 Service Manual February 1998 ...
Страница 98: ...5 12 StorEdge L280 Service Manual February 1998 ...