TABLE 1–3
Task Map: Maintaining a Storage Array
(Continued)
Task
Information
Replace a node-to-switch component.
■
Node-to-switch fiber-optic cable
■
FC host adapter
■
FC switch
■
GBIC or SFP
“Replacing a Node-to-Switch
Component” on page 42
Replace a node’s host adapter.
“How to Replace a Host Adapter”
on page 44
Add a node to the storage array.
Sun Cluster system administration
documentation
Remove a node from the storage device.
Sun Cluster system administration
documentation
StorEdge 6120 Array FRUs
The following is a list of administrative tasks that require no cluster-specific
procedures. See the
Sun StorEdge 6020 and 6120 Array System Manual
for the following
procedures.
■
Adding an expansion unit.
■
Removing an expansion unit.
■
Replacing an expansion unit.
■
Adding a disk drive.
■
Replacing a failed disk drive.
■
Removing a disk drive.
■
Replacing an Ethernet cable.
■
Replacing a power cable on the storage array.
■
Replacing a power and cooling unit (PCU).
■
Replacing a chassis.
■
Replacing a controller.
■
Replacing a storage array-to-switch component in a dual-controller configuration.
A storage array-to-switch component includes all of the following components.
■
Fiber-optic cable that connects an FC switch to a storage array
■
FC switch GBIC or an SFP that connects an FC switch to a storage array
■
FC switch that connects an FC switch to a storage array
■
FC switch power cord
■
Interconnect cables that connect two storage arrays
■
Interconnect cards
36
Sun Cluster 3.0-3.1 With Sun StorEdge 6120 Array Manual for Solaris OS • January 2006, Revision A