![Sun Microsystems Rack Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/sun-microsystems/rack/rack_service-manual_1392450015.webp)
Chapter 1
Sun Rack Service
9
2. Holding the carrier plate, pass the cable bundle through the space between the
outer frame and the rack mounting rail.
FIGURE 1-6
Cable Harness and Carrier Plate
After the cable ends are inserted, insert the carrier plate and push it forward toward
the front of the rack. As you slide the carrier plate in, the front end is guided by a
vertical channel on the front cover plate.
As the carrier is close to being fully inserted, a small tab on its bottom edge aligns
with a slot in the channel to position the carrier to the right. As this tab fully engages
a small vertical slot in the carrier plate engages and allows the carrier to drop into its
final position. At this point tighten the captive screw.
3. Repeat Step 2 for the upper cable harness (A).
Содержание Rack
Страница 4: ...iv Sun Rack Service Manual November 2002 ...
Страница 6: ...vi Sun Rack Service Manual November 2002 ...
Страница 18: ...12 Sun Rack Service Manual November 2002 ...