![Sun Microsystems Rack Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/sun-microsystems/rack/rack_service-manual_1392450014.webp)
8
Sun Rack Service Manual • November 2002
b. Pull the power sequencer out the front of the rack.
c. Disconnect the cable harness from the three connectors on the power
sequencer. Set the power sequencer aside.
5. Loosen the screw that holds the cable harness carrier plate to the rack.
6. Lift up the rear of the carrier plate so the notch clears the edge on which it is
seated.
7. Pull the carrier plate and cable harness out the back of the rack.
Replacing a Cable Assembly
Each cable harness consists of three cables bundled together on a carrier plate.
Viewed from the back of the rack, the cable harnesses and power sequencers are
mounted on the left side of the rack. The lower cable harness (B) is shorter than the
upper harness (A). Each cable carrier plate is installed in the slot above its respective
sequencer. It is more convenient to install the cables for the lower sequencer (B) first.
1. Remove the rack side panel, the power strip bracket cover, and the power strip
bracket.
Содержание Rack
Страница 4: ...iv Sun Rack Service Manual November 2002 ...
Страница 6: ...vi Sun Rack Service Manual November 2002 ...
Страница 18: ...12 Sun Rack Service Manual November 2002 ...